My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
call for bids/re-roof-1994
Orono
>
Property Files
>
Street Address
>
T
>
Tonkawa Road
>
0645 Tonkawa Road - 05-117-23-33-0019
>
Misc
>
call for bids/re-roof-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:14:00 PM
Creation date
5/28/2019 1:30:34 PM
Metadata
Fields
Template:
x Address Old
Address
0645 Tonkawa Rd
Document Type
Misc
PIN
0511723330019
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' C. TAKE ALL OTHER PROPER PRECAUTIONS TO PROTECT THE SAFETY <br /> AND HEALTH OF THE CONTRACTOR'S EMPLOYEES AND THE PUBLIC. <br /> ' D. In addition to the foregoing, the Contractor shall coordinate his use of the <br /> premises with the manager or other representative designated by the Project <br /> Manager. Subjects of this coordination shall include: <br /> 1. The designation of work and storage areas. <br /> 2. The furnishing by Contractor of appropriate signs and <br /> barricades to exclude unauthorized personnel from the <br /> ' work area and to call attention to hazards and dangers. <br /> 3. Other matters relating to the protection of property, <br /> ' customers and the general public. <br /> ' PRE-CONSTRUCTION CONFERENCE <br /> SP-6 Before commencing work under this contract, a meeting will be held with the <br /> Contractor and his prime subcontractors, and representative of the Temple Israel and the <br /> Project Manager, to discuss the contractual procedure, safety regulations, work <br /> procedures, and so forth to be used to accomplish the work requested. The meeting will be <br /> held at the job site. <br /> SCHEDULING WORK <br /> SP-7 Before any of the work is started, the Contractor shall confer with the Project <br /> Manager and Temple Israel and agree on a sequence of procedure; means of access to <br /> premises and building , delivery of material, and use of approaches; use of corridors, <br /> stairways, elevators and storage of materials. Contractor shall inform Project Manager <br /> ' when all roof removal will be completed to allow for him to be present. <br /> Contractor shall abide by times established by Temple Israel <br /> PROTECTION AND DAMAGE <br /> SP-8 The Contractor will: <br /> A. Provide all labor, material, and equipment necessary for protection of <br /> personnel, furnishings, equipment, or building structure from damage. <br /> Remove and replace movable items, if necessary. Replace or repair any <br /> items damaged, due to work performed under this contract, equal to their <br /> present construction and finish. <br /> ' 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.