My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
call for bids/re-roof-1994
Orono
>
Property Files
>
Street Address
>
T
>
Tonkawa Road
>
0645 Tonkawa Road - 05-117-23-33-0019
>
Misc
>
call for bids/re-roof-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:14:00 PM
Creation date
5/28/2019 1:30:34 PM
Metadata
Fields
Template:
x Address Old
Address
0645 Tonkawa Rd
Document Type
Misc
PIN
0511723330019
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' B. On the basis of the actual cost of materials and labor on the job site, <br /> a maximum of 10% on materials and 10% on labor for Contractor's <br /> ' overhead and profit, which shall include the cost of Insurance and <br /> field supervision. If the work is done by a subcontractor, the Prime <br /> Contractor may add not more than 10% for his general overhead and <br /> ' profit. In preparing the Supplemental Agreement, the following <br /> document must be provided: <br /> 1 1. A breakdown of material and an hourly breakdown of labor <br /> must be shown on each supplement submitted. <br /> ' 2. All supporting documents must be incorporated by reference <br /> on each supplement. <br /> ' 3. Corrections must be dated and initialed by the Contractor and <br /> Project Manager. <br /> 4. The contract summary must be complete, and adequate <br /> justification and supporting documentation must be included <br /> with each supplement. <br /> 8. PAYMENTS AND COMPLETION <br /> ' Article 9, "Payment and Completion" is supplemented by the following: <br /> ' Unless otherwise provided in the specifications, Temple Israel in making partial <br /> payments, will retain ten (10) percent of the duly approved value of the work <br /> performed under contract as of the date of the application for payment until final <br /> completion and acceptance of all work covered by the Contract. <br /> ' Payment request will be made on AIA forms G702-1978 and G703-1978. Request <br /> for payments will be given to Project Manager for his review and approval. <br /> ' Temple Israel may at its discretion, withhold final payment until the Contractor has <br /> filed with the Temple Israel an affidavit showing evidence that all claims against him <br /> ' by reason of the Contract have been paid or satisfactorily secured. In case such <br /> evidence is not furnished, Temple Israel may retain from any amount due said <br /> Contractor sums sufficient to cover all claims unpaid. <br /> All Contractors and Subcontractors shall comply with the provisions of Minnesota <br /> Statutes 290.92 relative to the withholding of Income Tax on wages and no final <br /> ' settlement with any Contractor shall be made until said Contractor has offered <br /> satisfactory proof that he has complied with the provision of the Withholding Section <br /> of the Statute: <br /> ' 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.