My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-23-2017 Council Packet
Orono
>
City Council
>
2017
>
01-23-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2019 2:23:35 PM
Creation date
5/28/2019 9:55:46 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUEST FOR COUNCIL ACTION <br />DATE: January 23, 2017 <br />ITEM NO.: 4 <br />Department Approval: Administrator Reviewed: Agenda Section: <br />Name Scott Oberaigner Y"-4 Public Works Director/ <br />Title Public Works Supervisor City Engineer's Report <br />Item Description: Approve Rehabilitation of Lift Station #6 (2478 Casco Point Road) and Lift Station #7 <br />(2552 Shadywood Road) <br />1. Purpose. The purpose of this action item is to gain approval to proceed with Lift/Grinder <br />Station Rehabilitation projects for 2017. <br />2. Background. The Sewer Department has developed a maintenance plan for the 46 <br />lift/grinder stations that are part of the sewer system. As part of the plan, each station is <br />inspected annually to identify routine maintenance needs. In addition to routine maintenance, the <br />plan also includes the upgrade of two lift stations per year. The lift stations that are upgraded are <br />selected based on a number of factors: age, maintenance records, issues discovered during the <br />annual inspection and the risks associated with the failure of the lift station. <br />3. Project Scope. Installation of new control panels, two new pumps per station, discharge piping <br />and all electrical work. <br />4. Cost. The City received 4 quotes listed below. The lowest quote from a qualified contractor was <br />$87,560 from Quality Flow Systems Inc. <br />Contractor <br />LS 6 <br />LS 7 <br />Total Quote <br />Quality Flow Systems Inc. <br />$ 43,780.00 <br />$ 43,780.00 <br />$ 87,560.00 <br />Quality Flow Iowa, Inc. <br />$ 45,400.00 <br />$ 45,400.00 <br />$90,800.00 <br />KSB, Inc. <br />$ 52,950.00 <br />$ 52,950.00 <br />$105,900.00 <br />Kriha Electric, LLC <br />$ 54,980.00 <br />$ 54,980.00 <br />$109,960.00 <br />5. Funding. This project will be funded through the Sanitary Sewer Enterprise Fund. The <br />Capital Improvement Plan (CIP) budgeted $110,000 for the rehabilitation. <br />COUNCIL ACTION REQUESTED <br />Consider a motion to accept the quote in the amount of $87,560 from Quality Flow Systems Inc <br />for the upgrade of LS 6 and LS 7. <br />
The URL can be used to link to this page
Your browser does not support the video tag.