My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-26-2017 Council Packet
Orono
>
City Council
>
2017
>
06-26-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 3:17:05 PM
Creation date
5/24/2019 3:07:08 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
American Landscape Company <br />1472492 n1 P1 N. <br />Maple Grove, MN 55369 <br />763-557-0155 <br />americanlandscapecompanv@gmaii.com <br />Website: http://alandscapecompany.com <br />PROPOSAL SUBMITTED TO: <br />Ron/Orono Golf Course <br />265 Orono Orchard Rd. <br />Orono, MN <br />952-215-8160 <br />rsteffenhagen@ci.orono.oln.us <br />PROPOSAL <br />Proposal Number 301471 <br />May 25, 2017 <br />WORK TO BE PERFORMED AT: <br />Same <br />We hereby propose to furnish the materials and perform the labor necessary for the completion of <br />For drainage issue strip sod and save to reuse as much as possible. Dig trenches as designated with feeder lines. <br />Use 1 main line with pipe supplied by golf course. For other lines use 4" drain pipe with a sock. Lower 2 storm <br />sewers to catch more water. Haul away excess dirt to designated area. Install 10 catch basins and drain pipe. Fill <br />trenches 2/3rds full of %" river rock. Put down fabric, dirt and existing sod over trench areas. Golf course will seed <br />as needed. <br />"This project will take approx. 4 days to complete. <br />All material is guaranteed to be as specified, and the above work to be performed in accordance with the <br />specifications sub mitted for above work and completed in a substantial workmanlike manner for the sum of <br />Twelve Thousand Four Hundred Ninety Dollars and No/00 ($12,490.00) with payments to be made as follows Y <br />upon starting and Y2 upon completion. <br />Respectfully submitted Gregory Klesk <br />Per American Landscape Company <br />Any alteration or deviation from above specifications involving extra costs <br />Will be executed only upon written order, and will become an extra charge over <br />And above the estimate. All agreements contingent upon strikes, <br />Accidents, or delays beyond our control. <br />Note — This proposal may <br />Be withdrawn by us if not <br />Accepted within 30 days. <br />ACCEPTANCE OF PROPOSAL <br />The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do <br />the work as specified. Payments will be made as outlined above. <br />Date Signature <br />
The URL can be used to link to this page
Your browser does not support the video tag.