Laserfiche WebLink
-duo <br />Mr. Ron Steffenhagen <br />Orono Golf Club <br />265 Orono Orchard Road S. <br />Wayzata, MN 55391 <br />Orono Golf Club Drainage Project <br />DUININCK <br />April 18", 2017 <br />Duininck Golf is pleased to provide an estimate to the Orono Golf Club for the drainage improvement <br />project. Our bid has been built from a site review and the drawing designed by Duininck Golf. <br />General Notes: <br />• Materials purchased by contractor: sand, drainage pea rock, HDPE dual wall drainage pipe, seed. <br />Materials purchased by owner: 8" perforated pipe. Estimated that the existing 8" perforated tile <br />on hand will be very close to sufficient for the quantity needed for project. <br />• Install a perforated drainage herringbone system in the requested areas of holes 1, 2, 4, 7, 8, 9. <br />• All perforated drainage lines to be backfilled with pea rock and a sand capping to bridge with the <br />pea rock. <br />• Excess soils from the excavations to be hauled to a nearby onsite owner -provided location. <br />• Holes under construction to be "out of play" until workers are finished with each hole. <br />• Owner to assist in locating/marking existing drainage lines for taps and tie-ins. <br />• Owner to locate all private utilities including irrigation. <br />• Any irrigation modifications by owner if needed. <br />• Any permit fees are by owner if needed. <br />• Timing of project dependent on weather and site conditions. <br />• Any cart path or haul road repair or replacement is by owner if necessary. <br />• After drainage areas have soaked up some of the ground moisture, contractor will remobilize <br />and prep/seed the areas around the new drainage lines to smooth out. Bluegrass seed provided <br />by contractor. Watering or maintenance of finished work areas is by owner. <br />• Price is good for 30 days from date above. <br />• Prevailing wages are not included in the price below. <br />• Base Bid must be accepted before any of the option pricing can be selected. <br />Base Bid: Hole #1 Project <br />Option 1: Hole #2 Project <br />Option 2: Hole #4 Project <br />Option 3: Hole #8 Project <br />Option 4: Hole #9 Project <br />Sincerely, <br />Steve Wolbeck, Estimator <br />Duininck Golf <br />Cc: Ahren Habicht, Project Manager <br />$15,700 <br />$ 6,200 <br />$ 4,500 <br />$21,400 <br />$12,800 > <br />Accepted by: <br />Date: <br />Owner Representative <br />A DIVISION OF DUININCK INCORPORATED <br />An EQual Omortunfitv Ennolover <br />