My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-26-2017 Council Packet
Orono
>
City Council
>
2017
>
06-26-2017 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 3:17:05 PM
Creation date
5/24/2019 3:07:08 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8099 Bavaria Road <br />Victoria. MN 55386 <br />Name / Address <br />Orono Public Golf Course <br />PO Box 66 <br />Crystal Bay, MN 55323 <br />Attention: Ron Steffienhagen <br />*U�E - <br />Phone # 9524432990 <br />Fax# 952.443.2835 <br />ww�v.hartmancompanies.com <br />Job Location <br />265 Orono Orchard Road <br />Orono, NIN 55391 <br />Date <br />Contract # <br />4/19/2017 <br />6341 <br />jr-j0p�r�posal <br />Expires <br />I Contact <br />I Terms <br />1 <br />5/19/2017 <br />om <br />Net 7 <br />Qty <br />U/M <br />Description <br />Price <br />Total <br />HOLE #9 LANDING ZONE AREA - 200'X 80' <br />0.36 <br />ACRE <br />Till existing turf and re grade to surface drain - Area 200'x 80' <br />6,000.00 <br />2,160.00 <br />800 <br />LN FT <br />Install 4" perforated tile, backfill with gravel <br />16.75 <br />13,400.00 <br />3 <br />EA <br />IS" catch basins installed on existing 8" tile <br />450.00 <br />1,350.00 <br />2 <br />EA <br />Perforate, repair and lower existing catch basins <br />250.00 <br />500.00 <br />1,800 <br />YDS <br />Install Futerra seed blanket and 70/30 blue/rye grass <br />2.75 <br />4,950.00 <br />HOLE#7-8 <br />I <br />EA <br />Install new 18" catch basin in #9 for 97-8 tile outlet <br />800.00 <br />SO' <br />250 <br />LN FT <br />InsLall owner supplied 8" pipe from #7 to new basin in #9 <br />16.00 <br />4.0W'.() <br />1 <br />EA <br />Cart path cold patch repairs <br />300.00 <br />300.00 <br />3 <br />EA <br />18" catch basin and drainage hollows <br />800.00 <br />2,400.00 <br />HOLE # 1 <br />250 <br />LN FT <br />installation of owner supplied 8" pipe from existing catch basin to new drainage hollow and <br />16.00 <br />4,000.00 <br />catch basin <br />2 <br />EA <br />Drainage hollow and 18" catch basin <br />800.00 <br />1,600.00 <br />1 <br />EA <br />EQUIPMENT MOBILIZATION <br />1,000.00 <br />1,000.00T <br />"Excess wil hauled to an onsite location <br />"Seeding 70/30 blue/rye and futema blanket installed as needed @ $2.75 yd <br />"Estimated start: Summer 2017 <br />Subtotal <br />$36,460.00 <br />Job Name: 2017 Course work <br />Sales Tax (0.0%) $0.00 <br />Customer Initial <br />Total <br />$36,460.00 <br />Contractor Initial <br />) 11 <br />) 3 <br />)z <br />
The URL can be used to link to this page
Your browser does not support the video tag.