My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-28-2019 Council Packet
Orono
>
City Council
>
2019
>
01-28-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2019 10:23:53 AM
Creation date
5/23/2019 10:22:28 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA ITEM <br /> <br />Prepared By: Reviewed By: Approved By: DJR <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1. Purpose. The purpose of this action item is to gain council approval to proceed with installation of a <br />sand screen in Well #3. <br /> <br />2. Background. In 2018, Well #3 underwent inspection. Inspections and rehabilitation should take <br />place every 7-10 years to ensure issues are detected early and before they become major problems. Well <br />#3 has not had a deliberate inspection and maintenance process since its installation in 1991. Since its <br />installation well #3 has not been able to operate full capacity due to heavy sand intake when the pump is <br />at full power. During the Well #4 project we added a screen to the well head since it was being drilled <br />into the same aquifer and sandstone formation. While the well was being inspected and rehabilitated city <br />staff asked the Traut Wells, to assess whether a similar screen on well #3 would be feasible. <br /> <br />3. Scope. Work includes pulling the pump, installing a sand screen then reinstalling the pump on Well <br />#3. <br /> <br />4. Cost. Traut Wells provided a quote of $98,650.00 to install a 40ft screen to Well #3. . <br /> <br />5. Funding. The work will be funded by the Water Fund. <br /> <br />COUNCIL ACTION REQUESTED: <br />Motion to accept the quotation in the amount of $98,650.00 from Traut Wells for adding a screen to Well <br />#3. <br /> <br /> <br />Item No.: 10 Date: January 28, 2019 <br />Item Description: Well #3 Sand Screen <br />Presenter: Adam T. Edwards <br />Public Works Director/City Engineer <br />Agenda <br />Section: <br />Consent Agenda <br />Fund Cost Amount Allocated <br />in the CIP <br />Est. Fund Balance <br />at end of 2019 <br />Water Fund $98,650.00 $92,000 $215,890 <br />Total $98,650.00
The URL can be used to link to this page
Your browser does not support the video tag.