My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-28-2019 Council Packet
Orono
>
City Council
>
2019
>
01-28-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2019 10:23:53 AM
Creation date
5/23/2019 10:22:28 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
200631v1 <br /> Submit copies of criminal background checks to the City. Note: all submissions to the City <br />are public record. Personal information listed in background checks, such as social security numbers, may be <br />blocked out in the submittal. <br /> Based on the results of the background check, the City shall have the right to prohibit <br />employees from entering customer properties. <br /> Promptly submit updated employee lists and background checks if staffing is revised. <br />e) The Contractor shall be available to respond to calls from customers concerning leaks, loss of <br />service, or other issues related to the installation. The Contractor must be available to respond to problems <br />associated with the installation twenty-four hours a day, seven days a week basis, and must respond to make <br />necessary repairs within two hours of receiving the call. Records of all calls and the response provided shall be <br />provided to the City the next work day. <br />f) Scheduling. Coordinate installation of water meters with each property owner according to the <br />following minimum requirements. Customer names, addresses, and account numbers will be provided. <br /> Prepare a letter from the contractor to the property owner requesting that the <br />property owner contact the contractor to schedule a time for meter installation. Contractor shall <br />utilize a toll-free phone number and website for residents to schedule appointments. Provide resident <br />with installer’s name, company, phone number, and photo identification, along with installation date <br />and time, via email, online portal, or U.S. mail prior to starting work. Notify the Customer of any <br />change to this information as soon as practical. <br /> Submit a letter to the City for review and consideration. Upon approval, <br />letters may be sent to Customers. <br /> If no response to the initial request is received within two weeks, send a follow- <br />up letter, or deliver a copy of the letter via door hanger. <br /> If no response to the second attempt is received within one week, visit the <br />property to attempt contact in person. <br /> If no contact is made, leave a door hanger with a copy of the letter. <br /> If no response is received within a week after making the third attempt at <br />contact, notify the City. <br />g) Installation Hours. Work is permitted at individual homes between the hours of 7:00 <br />AM to 8:00 PM, Monday through Saturday. Work on Sundays and holidays will not be required. <br />Other work schedules may be permitted with prior approval of the city to deal with unique <br />circumstances. <br />h) During installation the following information/ documentation shall be collected: <br /> Obtain digital photographs of existing meter installation documenting the <br />condition and configuration of the existing meter installation. Include the property address and date in <br />the photo or identify digitally in the filename or other means acceptable to the City. <br /> Obtain a digital photo of existing meter register showing the register <br />reading. <br /> Record the following information electronically in the field and provide records to <br />the City in Microsoft Excel Master File and PDF installation file format for each installation with <br />pictures along with property owner’s signature approving the installation. Confirm format of data with <br />the City prior to beginning work <br /> Property address. <br /> Account number <br /> Water service diameter and service material. <br /> Register reading and serial number of the old meter with pictures <br /> Serial number and register reading of the new water meter with pictures. <br /> Radio Identification number of the new endpoint and pictures of ID number and <br />location. <br /> Serial number, size and last inspection of any backflow devices. <br /> Check sump pump for illegal hook up to the City Sanitary Sewer. <br />i) Provide a daily report of activated meters and addresses to the City. The report may <br />be submitted electronically. All meter installations will also have a PDF file of each installation with
The URL can be used to link to this page
Your browser does not support the video tag.