My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-28-2019 Council Packet
Orono
>
City Council
>
2019
>
01-28-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2019 10:23:53 AM
Creation date
5/23/2019 10:22:28 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
200631v1 <br />photographs, and signature of property owner or their representative. <br />j) The contractor shall notify the City and building owners of the work schedule and <br />coordinate water shut downs to each building . The contractor shall schedule meter replacements as to not <br />interfere with normal operating hours for commercial businesses. It shall be the responsibility of the <br />contractor to make the arrangements with the building owner to acquire access. <br />k) If in the contractor's opinion, the condition of the existing building plumbing is such that <br />irreparable damage would result from attempting to install the water meter or if conditions are found that <br />are beyond the scope of the work, the contractor shall promptly notify the owner and City and not <br />proceed with the work at that location without further direction from the City. <br />l) The contractor, if impeded by paneling, partitions, or other obstructions in performing the <br />Work, shall promptly notify the owner at such premises to remove the obstructions so that the work can <br />be performed. <br />m) Meters shall be installed on the supply side of all plumbing fixtures and devices, <br />including, but not limited to, hose bibs, wate r softeners, and water heaters. Contractor shall immediately <br />notify owner and city of instances where a fixture is located upstream of an existing meter and not <br />proceed with the work at that location without further direction from the City. <br />n) All work must be performed in accordance with the Minnesota Plumbing Code, Minnesota <br />Department of Health regulations, and existing local and regional requirements. <br />o) The contractor shall leave the work site clean and neat upon completion of the installation. <br />Damage to such items as the building, personal property, and outdoor improvements shall be repaired by <br />Contractor without additional cost to the building owner or City. <br />p) Contractor shall be aware that some curb stops and interior valves may not be operational. <br />Contractor shall provide other means and methods required to stop the flow of water to allow installation <br />of the Work. These means and methods will be incidental to the work. <br />q) Existing meters shall be delivered to the City Public Works building after removal. The City <br />will dispose of meters at the end of the project. If the vendor chooses to retain the meters, the proposal shall <br />include a specific cost adjustment accordingly. <br /> <br />8) Training and Technical Support <br />a) A minimum of eight (8) hours of on-site instruction on the installation and servicing of <br />the meters and setters shall be provided by a representative of the water meter equipment supplier to the <br />City, at the City's convenience. This shall be incidental to the contract. <br />b) A minimum of eight (8) hours of on-site training and technical support in the operation and <br />troubleshooting of the meter reading system shall be provided to the City at the City's convenience. This <br />shall be incidental to the contract. <br />c) A minimum of eight (8) hours of on-site training and technical support in the operation <br />and troubleshooting of the billing software system shall be provided to the City at the City's convenience <br />after the initial route set-up has been completed. This shall be incidental to the contract. <br />d) A minimum of eight (8) hours of remote, follow -up technical support in the operation <br />and troubleshooting of the billing software system shall be provided to the City after the initial training. <br />This shall be incidental to th e contract. <br /> <br />D. City Water Meter Inventory. All of the City’s current meters are made by Neptune. <br /> <br />1). Inventory Estimate. <br />a) Type. <br />Size Quantity <br />Furnish 3/4" x 5/8" Water Meter 873 <br />Furnish 1" Water Meter 167 <br />Furnish 1.5" Water Meter 12 <br />Furnish 2" Compound Water Meter 13 <br />Furnish 3" Compound Water Meter 3 <br />Furnish 4" Compound Water Meter 2
The URL can be used to link to this page
Your browser does not support the video tag.