My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-28-2019 Council Packet
Orono
>
City Council
>
2019
>
01-28-2019 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2019 10:23:53 AM
Creation date
5/23/2019 10:22:28 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
200631v1 <br />b) The system shall be compatible with Windows 7 and upgradable to future versions of <br />Windows operating systems. <br />c) The system shall support migration of 12 months of historical meter data for the purpose of <br />analyzing usage patterns. <br />d) The system proposed should not require the City to obtain an FCC license. <br />e) The City desires that the AMR system functions, reports, and data on the control computer be <br />securely accessible remotely by properly authorized persons. <br />f) The software must be a dialog-based, intuitive, easy-to-use meter reading application. <br />g) After the meter reader starts the reading process, the software must be fully automated to <br />collect the meter reading data received from the radio receiver unit and store it in an export file which can be <br />used by the host software to update the mainframe route data. The System must support import/export via a <br />USB flash drive. <br />h) The software shall be touchscreen-friendly. <br />i) The software must have an option to wirelessly synchronize meter reading routes and reading <br />data with the host software in real time or on demand. <br />j) Unit must be capable of optimizing the memory storage space by filtering out duplicate <br />readings from the same MIU and keeping only the last reading received. <br />k) Each reading record must contain an MIU ID and a time stamp of the reading. <br />l) The software must have the option to provide found meter processing for new accounts. <br />m) The software must be capable of performing high/low tests on readings. <br />n) The software must provide a progress bar that provides route reading status for individual as <br />well as all routes combined. <br />o) The software must support retrieval and graphing of 90 days of data logging intervals from the <br />MIU. <br />p) The software must contain a test mode used to validate MIU installation. The test mode must <br />provide MIU <br />q) ID, reading, and flag status. <br />r) The software must have an option to geocode meter reading routes by address. <br />s) The software must allow a manual reading to be entered into the account record. <br />t) The software must allow freeform notes to be entered to record conditions in the field that <br />require noting and may require an additional work order created to address at a later date. <br />u) The software must have a GIS mapping option powered by ESRI ArcGIS. <br />v) The software must have advanced filtering to allow the user to view route mapping data by <br />conditions such as flag type/status, audit status, and read status. <br />w) The software must be capable of displaying meter points and read success and unread accounts <br />via GIS mapping interface. The software must be capable of collecting the following information for the host <br />to generate reports; leak detection, tamper detection, and backflow conditions. <br />x) The software must allow for GPS location tracking of the meter reading vehicle. <br />y) The software must allow for GPS breadcrumb tracking of the meter reading vehicle during the <br />route reading process. <br />z) The City requires a turn-key system compatible with the Caselle Clarity billing software. <br /> <br />7) Installation. <br />a) Vendor will be responsible for coordinating meter replacement with owners and tenants. <br />b) All installation technicians must be clearly identifiable with name badges and professional in <br />appearance. <br />c) Installation crews shall be experienced, trained, and technically competent. <br />d) Employees shall pass a criminal background check approved by the City and sign a waiver <br />release prior to entering customer properties. <br /> Submit a list of employees authorized by the contractor to enter and install water meters / <br />endpoints. <br /> Criminal background checks shall be completed for employees by an agency approved by <br />the City.
The URL can be used to link to this page
Your browser does not support the video tag.