My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Project manual for the Orangery-1994
Orono
>
Property Files
>
Street Address
>
T
>
Tonkawa Road
>
0500 Tonkawa Road - 05-117-23-32-0003
>
Misc
>
Project manual for the Orangery-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:12:53 PM
Creation date
5/17/2019 1:12:27 PM
Metadata
Fields
Template:
x Address Old
Address
0500 Tonkawa Rd
Document Type
Misc
PIN
0511723320003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 1 DIVISION 5- METALS <br /> Nelson Orangery 9415.00 <br /> October 3, 1994 1 <br /> 05120. STRUCTURAL STEEL <br /> A. STANDARDS <br /> 1. All structural steel work shall conform to the American Institute of Steel Construction <br /> (AISC) "Specification for the Design, Fabrication and Erection of the Structural Steel for <br /> Buildings,"latest edition, and the American Welding Society(AWS) D1.1 "Structural <br /> Welding Code," latest edition. . <br /> B. MATERIALS <br /> 1. Structural steel shall conform to ASTM--A36, latest revision. <br /> 2. Steel tubing shall conform to ASTM—A500, latest revision. <br /> 3. Bolts shall conform to ASTM—A325, latest revision. All bolts to be 3/4"diameter unless <br /> otherwise specified. <br /> 4. Clean all materials thoroughly and shop-apply one coat of Rust-Oleum#769 Primer or <br /> approved equal <br /> S. Non-Shrink Grout: See Section 3300,Article C, Item 2. <br /> C. EXECUTION <br /> 1. Make provision for enaction bads and for sufficient temporary bracing to maintain that the <br /> structure is safe, plumb, and in true alignment until completion of erection and installation <br /> of permanent bracing. <br /> 2. Do not field cwt or after structural members without approval of the Architect/Engineer. <br /> 3. After erection,prime all welds, abrasions,and any surfaces not shop-primed, except for <br /> surfaces to be in contact with concrete;use primer compatible with the shop coat. <br /> 4. Furnish complete Shop Drawings for all work, according to provisions in Section 00160. <br />
The URL can be used to link to this page
Your browser does not support the video tag.