Laserfiche WebLink
iiiv) CITY OF ORONO <br /> RESOLUTION OF THE CITY COUNCIL <br /> 1NO. 6989 <br /> �kES Fl <br /> required by the City and the MCWD shall be in place prior to commencing grading <br /> and excavation on the site. All such erosion control measures shall be maintained <br /> in working order until the site is vegetated and stabilized. <br /> 4. The construction limits shall be clearly marked with adequate fencing to prevent <br /> any construction damage or disturbance of any trees and vegetation outside of the <br /> construction limits area. Developer shall identify trees to be preserved on site, shall <br /> mark them on a site plan, and shall take extraordinary measures such as fencing, <br /> signage, etc. to ensure they are not disturbed. <br /> 5. This approval is based upon the known issues that may affect this project, but this <br /> approval does not limit the City from revising or amending these conditions as the <br /> review process continues. <br /> 6. Council approval is based on the entire record, above Findings. <br /> 7. Any amendments to the plans which are not in conformity with City codes may <br /> require further Planning Commission and City Council review. <br /> 8. Authorities granted by this resolution run with the Property not with the Applicants, <br /> but are permissive only and must be exercised by filing a final Plat application <br /> within one year of the date of Council approval, or the preliminary plat will expire <br /> on that date (May 13, 2020). <br /> 9. Violation of or non-compliance with any of the terms and conditions of this <br /> resolution may result in the termination of any authority granted herein. <br /> C. Plans and Specifications. The following plans and specifications shall be submitted <br /> for review and approval by the City and other appropriate jurisdictions: <br /> 1) Final plans and specifications for all proposed utility lines and services, including <br /> any proposed revisions to existing service facilities. Proposed plans shall be <br /> provided to the City for final review and approval with the Final Plan set. The <br /> Public Works Department and any other pertinent reviewing agencies shall <br /> review and approve all utility improvements. Final sanitary sewer and watermain <br /> plans shall be provided and are subject to approval by the Public Works <br /> Department and City Engineer. <br /> 4 <br />