My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 6989
Orono
>
Resolutions, Ordinances, Proclamations
>
Resolutions
>
Reso 0001-7499
>
Reso 6900 - 6999 (September 24, 2018 - July 8, 2019)
>
Resolution 6989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2019 9:53:47 AM
Creation date
5/15/2019 9:53:45 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
icO4rp CITY OF ORONO <br /> RESOLUTION OF THE CITY COUNCIL <br /> ";$.,0‘1L4'GNO. 6989 <br /> 'kxs H oO' <br /> 2) Final Street and Storm Sewer Plans. <br /> 3) Final Grading, Drainage and Erosion Control Plan and SWPPP showing existing <br /> and proposed contours, building locations, elevations, stormwater facilities and <br /> calculations,utilities and erosion control measures to be used during construction. <br /> General Development Plan Approval will not be granted until the Minnehaha <br /> Creek Watershed District has approved the stormwater plans. <br /> 4) Landscaping plan to reflect a more natural pattern of replacement trees, versus a <br /> lineal replacement pattern along the new road. <br /> 5) Any additional plans and specifications deemed necessary by the City as review <br /> progresses. <br /> D. Platting Process. Applicant shall complete all requirements for Final Plat Approval as <br /> follows. The following list of final submittals must be submitted to the City <br /> Administrator 2 weeks prior to the regularly scheduled Council meeting on the second <br /> Mondays of the month. These submittals are as follows: <br /> 1). Record plat drawings in the form of two (3) mylar copies (one copy for the City's <br /> records and one for filing with Hennepin County) and one (1) copy reduced to 1" = <br /> 200'. Drawing to include: <br /> A. Lot lines platted per preliminary plat survey/drawing by Gronberg <br /> and Associates dated April 3, 2019 attached hereto as Exhibit B, <br /> except as modified herein. <br /> B. Dedication of "drainage and utility easements" 10' along exterior <br /> property lines and 5' along the interior property lines. <br /> C. Dedication of"Drainage Easements" over all drainageways. <br /> D. Name of plat. <br /> 2). Legal documents required: <br /> A. Title opinion addressed to the City or a title insurance policy in favor <br /> of the City. All owners, mortgage holders or others with property <br /> interest indicated therein shall sign the plat and all other documents <br /> affected by such interest. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.