Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
s-ONp CITY OF ORONO <br /> RESOLUTION OF THECITYCOUNCIL <br /> p 0 <br /> NO. 6 7 9 <br /> t�KESHG4" <br /> 2. Easements shall be provided as required by the City Engineer. <br /> 3. Significant trees shall be preserved to the extent possible and as shown on the <br /> landscaping plans. <br /> 4. Upon evidence of pre-settlement history,the developer will contact the city and the <br /> State Historical Preservation Office prior to proceeding. <br /> 5. The following estimated fees are due at the time of final plat unless otherwise noted. <br /> These fees are based on the 2019 Fee schedule and the fee schedule in effect at the <br /> time of Final Plat approval will govern. <br /> a. Stormwater and Drainage Trunk: The property will be subject to the Stormwater <br /> and Drainage Trunk Fee (SW&DT Fee) of $48,420.00 (Number of new lots (6) <br /> times per lot amount ($8,060). <br /> b. Sewer: The costs to construct the Sewer system within the site will be the <br /> developers responsibility. The Metropolitan Council SAC charge which is <br /> currently $2,485 per dwelling unit will be due at the time of building permit for <br /> each lot. The City's sewer charge is $5,225.00 per lot, or$36,575.00. <br /> c. Water: The costs to construct the water system will be the developers <br /> responsibility. The City's water charge is $29,680.00 ($4,240 per dwelling unit). <br /> d. Park dedication: $33,300 ($5,550 x 6 new lots). <br /> B. General conditions imposed on preliminary plats shall apply, and are as follow: <br /> 1. Appropriate traffic control signage within and pertinent to the site shall be installed <br /> by the Developer subject to the City Engineer's review and approval. <br /> 2. Applicant shall demonstrate to the satisfaction of the City Council that all <br /> requirements of the Minnehaha Creek Watershed District as administrator of the <br /> WCA regulations on Orono's behalf, are complied with. <br /> 3. Erosion control shall adhere to "Best Management Practices for Protecting Water <br /> Quality in Urban Areas" and to the approved SWPPP. All erosion controls as <br /> 3 <br />