My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-009510 - new septic system
Orono
>
Property Files
>
Street Address
>
T
>
Thoroughbred Lane
>
2425 Thoroughbred Lane - 04-117-23-11-0018
>
Septic
>
1997-009510 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:06:17 PM
Creation date
4/17/2019 1:29:20 PM
Metadata
Fields
Template:
x Address Old
House Number
2425
Street Name
Thoroughbred
Street Type
Lane
Address
2425 Thoroughbred La
Document Type
Septic
PIN
0411723110018
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. - DOWPJSLOPE DIKE WIDTH <br /> 1. If landslope is 3% or more,subtract rock layer width from <br /> adsorption width to obtain minimum downslope dike toe <br /> 9V•22 ft- _ft =) 0 feet <br /> 2. Calculate Minimum mound size based on geometery: <br /> a. Determine depth of clean sand fill at upslope edge of rock <br /> layer: Separation ). 0 feet <br /> b. Multiply rock layer width by landslope 1 raoC cev.r <br /> to determine drop in elevation; t taut Ro ad <br /> Slope Difference Separation •O Oat <br /> 0 x 3 %i 100= feet SIODe Difference et <br /> UpsloDe Width <br /> c. Add depth of clean sand for separation (2a) -a-feet Rock ea Width <br /> at upslope edge,depth of rock layer(1 foot) to depth of 1=feet Downslope Width <br /> cover(1 foot) to find the moundi ht at the upslope edge 12 feet <br /> of rock lay <br /> 9ft+ Ift+ Ift= feet <br /> d. Enter table with landslope and upslope dike ratio. <br /> Select dike multiplier of .S <br /> e. Multiply dike multiplier by M§ppe mound height a• <br /> to find upslope dike width: x 3•S7 = feet <br /> f. Add depth of clean sand for slope difference (2b)at <br /> downslope edge,to the mound height at the upslope edge <br /> of r er(2c) to downmlope height; <br /> ft ft 'b eet <br /> g. Enter table with landslope and downslope dike ratio. <br /> Select dike multiplier of 4.S y <br /> h. Multiply dike multiplier by dow lope mound hei � <br /> to get downslope dike width:x _ fee <br /> i. Compare the values of step G.1 and Step G.2h Select the <br /> greater of the two values as the downslope dike width; <br /> 17 feet <br /> D oD W10tn <br /> j. Total mound width is the sum of <br /> upslope dike(G-2e) width plus rock € RL Ck ee Width <br /> 10�JtSS net <br /> o <br /> layer width (D.2)plus ,l I1D61 Wlatn U 1 D.wIDtn <br /> downslope dike width(G.21); 3 na feet <br /> _lLft+�Qft+�_ft= feet SM <br /> k. Total mound length is the sum of Downslope Width <br /> g -.. net <br /> upslope dike width (G.2e)plus rock layer <br /> length (D.3)plus upslope dike � (G.2e); <br /> ft+ ft +_jrb ft= ..V feet <br /> Ir) f + l. :K -r 1 /o'er <br /> Total tenptn oa <br /> Downslope Upslope <br /> 3:1 4:1 5:1 6:1 7:I 3:1 4:1 5:1 61 7:1 8:1 <br /> %slope <br /> 0 3.0 4.0 5.0 6.0 7.0 3.0 4.0 5.0 6.0 7.0 8.0 <br /> 1 3.09 4.17 526 638 753 2.91 3.85 4.76 5.66 654 7.41 <br /> 2 3.19 435 556 6.82 8.14 2.83 3.M 453 536 614 6.90 <br /> 3 330588..--- 732 6.86 _ 273 6357, 435 5.08 5119 6.45 <br /> 4 3A3 476 '675 7.89 .. --9.72 ._..2.68----`3.d5 4.17 4.83 5.46 6.06 <br /> 5 351 s.00 &67 8-57 1077 2.61 3.33 4.00 4.62 5.19 571 <br /> 6 3.66 526 7.14 938 1107 254 323 3.85 4.41 4.93 SAI <br /> 7 3.80 556 7.69 1034 1373 248 3.12 3.70 423 d.70 5.13 <br /> 8 3.95 s88 833 1154 15.91 2.42 3.03 357 4.055 4.49 486 <br /> 9 4.11 625 9.09 13.04 18.92 236 2.94 3.45 3.90 430 41Z <br /> 10 429 667 10.0 15.00 2333 231 2.86 333 3.75 4.12 4.44 <br /> 11 4A8 7.14 11.11 17.65 30.43 226 2.78 3.23 3.61 3.95 426 <br /> 12 419 7.69 1250 21.43 43.76 1 2.21 2.70 3.12 3.49 3.80 4A8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.