My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-009510 - new septic system
Orono
>
Property Files
>
Street Address
>
T
>
Thoroughbred Lane
>
2425 Thoroughbred Lane - 04-117-23-11-0018
>
Septic
>
1997-009510 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:06:17 PM
Creation date
4/17/2019 1:29:20 PM
Metadata
Fields
Template:
x Address Old
House Number
2425
Street Name
Thoroughbred
Street Type
Lane
Address
2425 Thoroughbred La
Document Type
Septic
PIN
0411723110018
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r F-17 <br /> 1 PUMP SELECTION PROCEDURE <br /> END PERFORATION OF A PERFORATED LATERAL <br /> A. Determine pump capacity: <br /> Gravity Distribution Tom" <br /> 1. Minimum suggested is 600 gallons per hour(10 gpm)to stay ahead of . o<c..N.,w FaMk(or <br /> water use rate. `"�►:"°`°"' '°' """"'.�"""'° <br /> ry,-!';,,XW.ouo..I <br /> 2. Maximum suggested for delivery to a drop box of a home system is 2,700 fpbg"'go OnfNe gon3on1.11V <br /> Into too War Teo <br /> gallons per hour(45 gpm)to prevent build-up of pressure in drop box. :,,;p„ . Le , le to Ed <br /> g* <br /> ww <br /> RWA Lofts <br /> _. wwaiar LsrnNA @I <br /> Pressure Distibution cw.n s"nd L"W a"'°""'"'"°' <br /> 3.a. Select number of perforated laterals 3 <br /> b. Select perforation spacing= n_feet. ask" S"d or 1N° <br /> C. Subtract 2 ft.from the rock layer length. <br /> raw -2 ft.=_ Le&-o feet <br /> ermine <br /> d. Detthe number of spaces between perforations. <br /> Length perf.spacing=(6(L ft.+__-AL_ft.=2 1 spaces Required Perforation Discharge <br /> e. ,'1.-L spaces+1= .'"1� perforations/lateral in Mons per minute Y <br /> f. Multiply perforations per lateral by_ number of laterals to 3� s` a 2''P�+ 34'"a <br /> get total number of perforations. ,- x3Q,,= o perforations. cfeeU <br /> g x Pd_�gpm. <br /> 1.0a 0.74 <br /> SELECTED PUMP CAPACITY `S gpm 2.Ob 0.80 1.04 <br /> B.Determine head requirements: a.Use for single family homes <br /> 1. Elevation difference between purpp and point of discharge. b.Use for all other applications <br /> IT feet <br /> 2. If pumping to a pressure distribution system,five feet for pressure <br /> required at manifold if gravity stem,zero. <br /> s feet <br /> 3. Friction loss <br /> a. Enter friction loss table with gpm and pipe diameter. Pipe Length <br /> Read friction loss in feet per 100 feet from table. Point of Disch <br /> RL= �.(e ft./100 ft of pipe a)�e <br /> b. Determine total pipe length from pump to dischargeElevation Differenc110)0 point. Add 25 percent to pipe length for fitting P <br /> loss,or use a fitting loss chart. Equivalent pipe <br /> length-1.25 times pipe length= F-18b <br /> /10 x1.25= u4 feet <br /> c. Calculate total friction lossmultiplying1.5 inch 2.0 inch ainch <br /> by gpm tri m PW 100 s of pipe <br /> friction loss in ft/100 ft by equivalent pipe length. <br /> x +100= u feet 10 0.69 0.20 <br /> Total friction loss= <br /> �- � --I-- '12 0.96 0.28 <br /> 4. Total head required is the sum of elevation difference, 14 1.28 0.38 <br /> special head requirements,and total friction loss. 16 1.63 0.48 <br /> 18 2.03 0.60 <br /> 20 2.47 0.73 0.11 <br /> _+�_+ _ 25 3.73 1.11 0.16 <br /> 00 (2) (30 30 5.23 1.55 0.23 <br /> 35 7.90 2.06 0.30 <br /> 40 11.07 -2,04-_ 0.39 <br /> TOTAL HEAD �_feet 45 14.73 3.28 0.48 <br /> 50 3.99 0.58 <br /> 55 4.76 0.70 <br /> C. Pump selection 60 5.60 0.82 <br /> 1. A pump must be selected to deliver at least <br /> �?�gpm (Step A)with at least _feet of total head(Step B). <br />
The URL can be used to link to this page
Your browser does not support the video tag.