My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-P06637 - new septic system
Orono
>
Property Files
>
Street Address
>
T
>
Tamarack Drive
>
1085 Tamarack Drive - 26-118-23-31-0017
>
Septic
>
2003-P06637 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:16:41 PM
Creation date
4/16/2019 12:01:46 PM
Metadata
Fields
Template:
x Address Old
House Number
1085
Street Name
Tamarack
Street Type
Drive
Address
1085 Tamarack Drive
Document Type
Septic
PIN
2611823310017
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FROM : RYS PHONE N0. : 4422091 Jul. 02 2003 09:19AM P7 <br /> PRESS QRE DISTRI13IMON SYSTUM <br /> 1. Select number of perforated laterals <br /> 2. Select perforation spacing = :3 ft. <br /> I Since perforations should not be placed closer than 1 ft. to <br /> the edge of the rock layer (see p. E-14),subtract 2 ft.from the <br /> rock layer length. <br /> Rock layer length-Z ft. <br /> 4. Determine the number of spaces between perforations. <br /> Divide the length above by perforation spacing and round E-17a <br /> down to nearest whole number. <br /> TAA18jLP-0FPEgMRAT10N DLSCHAR ES 1!V= <br /> Head Perforation diameter(inches) <br /> Length perf. spacing =40 ft. + ft. = spaces i4 <br /> c3i (z) 1.Oa 0.56 ala <br /> 1.5 0.90 <br /> 5. Number of perforations is equal to one plus the number of 2.Ob 0.80 1.04 <br /> 2.5 0.89 1.17 <br /> perforation spaces. 3.0 0.98 1129 <br /> 4.0 1.13 1.47 <br /> 5.0 126 t_65 <br /> spaces +1 = perforations/lateral 7U-se 1.0 foot of head for residential systems. <br /> bUse 2.0 feet of head for other establishments <br /> & Multiply perforations per lateral by number of laterals to <br /> get total number of perforations. E-l7b <br /> �i xerforations_ .�...,.�. <br /> laterals pelfs/lateral p 1.25 inch 1.5 inch 2.0 inch <br /> 23 14 18 28 <br /> 7. Determine required flow rate by multiplying 3.0 13 17 26 <br /> number of perforations by flow per perforation 4 o 11 is 23 <br /> (see page E-17) 5.0 10 14 22 <br /> 11R 13 <br /> Perfs x V--pert gpm- E 15 <br /> ,ar <br /> 8. If laterals are connected to header pipe as shown on page E- <br /> 15,select minimum required lateral diameter from table on �- <br /> page E-17;enter table with perforation spacing and number ,�'' werM <br /> of perforations per lateral. Select minimum diameter for <br /> perforated lateral = inches. <br /> E-12 <br /> =M=1r= <br /> 9. If perforated lateral system is attached to manifold pipe near �'�"��.� �,.• <br /> the center, as on page E-12,perforated lateral length and 6 4.41 <br /> number of}perforations per lateral will be approximately one <br /> half of that in step 8. Using these values,select minimum <br /> diameter for perforated lateral from page E-17 as �✓''� <br /> inches. <br />
The URL can be used to link to this page
Your browser does not support the video tag.