My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-P06637 - new septic system
Orono
>
Property Files
>
Street Address
>
T
>
Tamarack Drive
>
1085 Tamarack Drive - 26-118-23-31-0017
>
Septic
>
2003-P06637 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:16:41 PM
Creation date
4/16/2019 12:01:46 PM
Metadata
Fields
Template:
x Address Old
House Number
1085
Street Name
Tamarack
Street Type
Drive
Address
1085 Tamarack Drive
Document Type
Septic
PIN
2611823310017
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. ,FROM RYS PHONE NO. : 4422091 Jul. 02 2003 09:18AM PG <br /> DOWNSLOPE DIKE WIDTH <br /> ,l. If landslope is 3% or more,subtract rock layer width from <br /> adsorption width to obtain minimum downslope dike toe <br /> ZD ft-. JO ft= /0 feet <br /> 2 Calculate Minimum mound size based on geometery: <br /> a. Determine depth of dean sand fill at upslope edge of rock <br /> layer.Separation / feet <br /> b. Multiply rock layer width by landslope 1 foot cover <br /> to determine drop in elevation; 1 root; Ro ed <br /> Slope Difjference � � s■oer■sten fur, <br /> l0 x %+100= feet SI■o■Difference t <br /> UDs■ Math <br /> c. Add depth of clean sand for separation(2a) feel <br /> ]zo<r sea wrath <br /> at upslope edge,depth of rock layer(1 foot) to depth of 4.0 feet Dow a e,■width <br /> cover(1 foot)to find the-mound height at the upslope edge feet <br /> of rock layer; <br /> ft+ Ift+ lft= feet <br /> d. Enter table with landslope and uyslope dike ratio. <br /> Select dike multiplier of Z Q�g <br /> e. Multiply dike multiplier by upslope mound height <br /> to find upslope dike width: 3 x�= /0 feet <br /> f. Add depth of clean sand for slope difference(2b)at <br /> downslope edge,to the mound height at the upslope edge <br /> of rock layer(20 to find the downslope height; <br /> ft+ ft=Meet <br /> g. Enter table with landslope apd downslope dike ratio. <br /> Select dike multiplier of Z1,7�- <br /> h. Multiply dike multiplier by downs ope,�o/und height <br /> to get downslope dike width ;, x , feet <br /> i. Compare the values of step G.1 and Step G.2h Select the / <br /> greater of the two valuesa the ownslope dike width; <br /> feet <br /> ;Fi:;i;.: <br /> •`; �i.3:S,e•;`•"`"ts:;: <br /> j. Total mound width is the sum of s � <br /> upslope dike(G.2e)width plus rock E. .� wrath `_'::`. <br /> layer width (D.2)plus / e ue91 a wretn <br /> ..1 <br /> 2 <br /> lest o.pt1.wtotn <br /> slope dike width(G_2i) k• , feet <br /> own <br /> ft+ /C-) ft+ ft - Z Ofeet <br /> k. Total mound length is the sum of `Do" <br /> upslope dike width(G.2e)plus ruck layer " <br /> len (D.3 us u Io dike wi (G.2e); <br /> gth ) ps :.; ;. .. <br /> pod - <br /> j. . <br /> �a <br /> ft <br /> ft+ / ft- feet <br /> �� tel unpin <br /> 3:1 l•1 5A Wwrlslupe 611 7:1 3:1 ll p$1 6;1 <br /> s.lepe <br /> 0 3A 4 o SA 30 7.0 3.0 4.0 S.0 .10 7,0 1A <br /> l 3,W 417 5.26 6Je 753 2,91 3.39 6.76 5,66 644 7,61 <br /> 2 3.19 4.9 SS6 6.42 314 183 3,70 144 5-16 6,14 6.90 <br /> 1 $30 654 SM 752 6.e6 17S 30 6.35 5.01 5.79 6A5 <br /> 4 3.61 L76 62S 7.14 9.75 W 3.45 4,17 4.44 5.46 6A6 <br /> S 351 $AD 6.67 147 10.77 2.6,1 3.33 too 4.62 5.19 5.71 <br /> 6 3I6 5,26 7.111 9.34 1207 154 3.73 3.35 4,41 11.93 SAI <br /> 7 310 546 7.69 10.34 13.73 1.16 3.17 170 4Z 4.70 S.13 <br /> 1 3.9s 1,11 637 11311 1191 Z42 3.033F us 6A9 4e/ <br /> 1 411 4.25 9.09 13L6 1197 2.36 2w 3,45 3.90 430 145 <br /> 10 419 6.67 10.0 IS.00 23.33 131 2.66 111 3.75 4.12 11.4 <br /> it 4,44 7.14 11.11 17.65 30.63 226 7.78 3.23 161 3.95 616 <br /> 12 W 7,66 I2S0 I1.43 41.75 221 2.70 3115 119 3.60 4.01 64 <br />
The URL can be used to link to this page
Your browser does not support the video tag.