My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-P06637 - new septic system
Orono
>
Property Files
>
Street Address
>
T
>
Tamarack Drive
>
1085 Tamarack Drive - 26-118-23-31-0017
>
Septic
>
2003-P06637 - new septic system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:16:41 PM
Creation date
4/16/2019 12:01:46 PM
Metadata
Fields
Template:
x Address Old
House Number
1085
Street Name
Tamarack
Street Type
Drive
Address
1085 Tamarack Drive
Document Type
Septic
PIN
2611823310017
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FROM : RYS PHONE NO. 4422091 Jul. 02 2003 09:19RM P8 <br /> 9 <br /> PUMP SEL)=C.TION PLQ EUURE <br /> q.. Determine pump capacity: <br /> Gravity Distribution <br /> 1. Minimum suggested is 20 gpm <br /> 2. Maximum suggested is 45 gpm Perforation Discharges in GPM <br /> Head Perforation diameter <br /> Pressure Distibution feet inches <br /> 3.a. Select number of perforated laterals 7/32 1/4 <br /> b. Select perforation spacing= feet- 1.02 0.56 0.74 <br /> C. Subtract 2 ft.from the rock layer length. 1.5 0.69 0.90 <br /> Rvdc layer ialth <br /> -2 ft.= feet. 2.0b 0.80 1.04 <br /> d. Determine the number of spaces between perforations. a Use 1.0 foot single homes_ <br /> Length perf.spacing= ft.r ft.= spaces b Use 2.0 feet for anything else. <br /> e. _spaces+1= perforations/lateral <br /> f- Multiply perforations per lateral by number of laterals to <br /> get total number of perforations- T.-=err x w;, ,«�= perforations. <br /> g. xa--gpm. <br /> SELECTED PUMP CAPACITY gpm <br /> B.Determine head requirements: <br /> 1. Elevation difference between ump and point of discharge- <br /> feet <br /> 2. If pumping to a pressure distribution system,five feet for pressure Soil amunerd.,ph.. <br /> required at manifold if gravity s stern,zero. <br /> feet TOWa pipe 1'sei <br /> 3. Friction loss <br /> a. Enter friction loss table with gpm and pipe diameter. ,;„ <br /> Read friction loss in feet per 100 feet from table(F-14). pipe <br /> F.L.= •d ft-/100 ft of pipe .-............. . <br /> b. Determine total pipe length from pump to discharge - - -- - <br /> point Estimate by adding 25 percent to pipe length for fitting <br /> loss,or use a fitting loss chart(F-15 feet). <br /> Equivalent pipe 1 -1.25 t_ 1 -9'f length- <br /> x 1.25= Friction Loss in Plastic Pipe <br /> c. Calculate total friction loss by multiplying <br /> friction loss in ft/100 ft,�bY'equiva ipe length Nominal <br /> .,� <br /> Total friction loss= � p x -100=_-feet pipe dia. <br /> Flow Rate <br /> 4. Total head required is the sum of elevation difference, gpm 1-5" 2" 3" <br /> special head requirements,and total:friction loss. <br /> 20 2.47 0.73 0.11 <br /> 3 Z + {� _ 25 3.73 1.11 0.16 <br /> (Y) (2) (30 5.23 0.23 <br /> 6.% eW 0.30 <br /> 40 8.91 0.39. <br /> TOTAL HEAD feet 45 11.07 3.28 0.48 <br /> 50 13.46 3.99 0.58 <br /> G Pump selection 60 5.60 0.8702 <br /> 822 <br /> 65 6.48 0.95 <br /> 70 7.44 1.09 <br /> 1. A pump must be selecte <br /> to deliver at least <br /> gpm (Step A) with at least feet of total head (Step B). <br />
The URL can be used to link to this page
Your browser does not support the video tag.