My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-15-2019 Planning Commission Packet
Orono
>
Planning Commission
>
2019
>
04-15-2019 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2019 10:44:16 AM
Creation date
4/16/2019 9:41:37 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Date Application Received: 02/20/19 0�T <br /> Date Application Considered as Complete:03/20/19i VO <br /> 60-Day Review Period Expires: 05/19/19 <br /> To: Chair Thiesse and Planning Commission Members �`�� �� <br /> Dustin Rief, City Administrator <br /> �kEsxo¢� <br /> From: Melanie Curtis, Planner h'1GG <br /> Date: 15 April 2019 <br /> Subject: #LA19-000023, Nor-Son Custom Builders o/b/o Charles &Jill Miller, <br /> 1600 Bohns Point Road, <br /> IUP—Export 500+cubic yards of material <br /> Public Hearing <br /> Application Summary: The applicant is requesting an interim use permit to export <br /> approximately 1,300 cubic yards of material in conjunction with construction of a new <br /> residence. <br /> Staff Recommendation: Planning Department Staff recommends approval with conditions. <br /> Background <br /> A new home is proposed at 1600 Bohns Point Road.The project will involve the export of <br /> approximately 1,300 cubic yards of material from the site; an interim use permit(IUP) is <br /> required. <br /> Section 78-330-Lot Area/Width: <br /> LR-1B Lot Area Lot Width <br /> Required 43,560 s.f. (1.0 acres) 140' <br /> Actual 54,802 s.f. (1.25 acre) 200' @ 75'/ 177' @ OHWL <br /> Applicable Regulations: <br /> Interim Use Permit (Code Section 78-1726(a)(6)) <br /> The construction of the new home will result in 1,300 cubic yards of unneeded material.The <br /> applicant proposes to export this from the site; the destination will not be within the City.The <br /> proposed home will not be out of character with the neighborhood. <br /> Applicable Regulation: Interim Use Permit(Section 78-1726) <br /> The Planning Commission may recommend and the Council may grant an Interim Use Permit <br /> (IUP). On the basis of the application and the evidence submitted,the city council <br /> determines that the use will comply with the following: <br /> 1) The use will meet the general performance standards in section 78-916 of this chapter; <br /> the proposed grading will conform to the standards within Section 78-916 of the Zoning <br /> Code. <br />
The URL can be used to link to this page
Your browser does not support the video tag.