Laserfiche WebLink
� <br /> � <br /> O� . <br /> � <br /> O:;\ O <br /> ������ � CITY of ORONO <br /> +'� ���f`'��`�,.��' �, Municipal Off ces <br /> �'� �i'��,� ��' G~ Street Address: Mailing Address: <br /> L�9xEs�p4�� 2750 Keliey Parkway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> July 18, 1994 <br /> Mr. Steven Krogness <br /> 605 Stubbs Bay Road North <br /> Maple Plain, Minnesota 55359 <br /> Dear Mr. Krogness: <br /> The purpose of this letter is to confirm the results of our July 12, 1994 inspection of your septic <br /> system. Duane Ritter excavated the septic system beginning at the area where discharge was <br /> evidenced revealing a chunk of clay sewer line completely plugged with sewage solids. This <br /> pipe crumpled into pieces from contact with a hand shovel. Further excavation revealed a transit <br /> pipe in good condition beyond this section, however the line ended at this point and an area was <br /> excavated approximately 10' in diameter and no evidence of a drainfield area was observed. <br /> The soil excavated in this area was original, indicating that the system never had a drainf'ield. <br /> Based on the site inspection, no repair of the existing system can be made which will relieve the <br /> surface discharge problem that is currently being experienced. A system repair would only be <br /> effective if the drainfield line was plugged, but drainfield trenches were available and in <br /> adequate condition to receive the sewage output from the home. As no drainfield is available, <br /> a new system must be installed. Site evaluation and septic system design have been completed <br /> and approved by the City for installation. Other sites may be available on your property which <br /> meet City and State code if the cunent design is not satisfactory for you. <br /> In order to insure that repairs will be completed in a timely fashion, the following repair tune <br /> line must be met. Soil testing and septic system design must be submitted by August 1, 1994 <br /> for approval. Once the plan is approved, several bids should be obtained and a permit must be <br /> issued to the contractor of your choice by September 1, 1994. <br /> If there are any questions or problems that arise during the repair procedure, please contact me <br /> at the City offices as soon as possible to prevent legal complications. The City of Orono's office <br /> hours are between 8:00 a.m. and 4:30 p.m. Monday through Friday. <br /> Sincer ," <br /> � <br /> Stephen Weckman <br /> On-Site Systems Manager <br /> SW/ch <br /> Telephone (612) 473-7357 • FAX 473-0510 <br />