Laserfiche WebLink
DuAll Service Contractors <br /> WOJCIESZAK,JOY 10/27/2004 <br /> CONTINUED-Dresaiug <br /> DESCRIPITON QUANTITY UN1T COST RCV <br /> Clean and deodorize building-Ozone treatment 238.44 CF 0.03 7.15 <br /> Room Totals:Drea�Ing 68.35 <br /> edn <br /> s�r�:� Room:Closet <br /> � T <br /> N � � � <br /> N <br /> 1 <br /> � +a++'� 198.67 SF Walls 20.83 SF Ceiling <br /> 219.50 SF Walls&Ceiling 20.83 SF Floor <br /> 2.31 SY Flooring 24.83 LF Floor Perimeter <br /> 24.83 LF Ceil.Perimeter <br /> DESCRIPTION QUANTTfY UN1T COST RCV <br /> Paint the wa11s and ceiling-one coat 219.50 SF 0.32 70.24 <br /> Clean and deodorize building-Ozone treatment 166.67 CF 0.03 5.00 <br /> Room Totals:Ctoset 75.24 <br /> 102104-00001 Page: 13 <br />