Laserfiche WebLink
DuAll Service Contractors <br /> WOJCIESZAK,JOY 10/27/2004 <br /> 5'r--�_ Room:Mxster Bxth <br /> -_1 s � <br /> H <br /> ` 194.67 SF Walls 35.83 SF Ceiling <br /> � �""�'s°"' 230.50 SF Wa11s&Ceiling 35.83 SF Floor <br /> 1 � 3.98 SY Flooring 24.33 LF Floor Perimeter <br /> N � 2433 LF Ceil.Penmeter <br /> r-s a--i <br /> DESCRIPTION QUANTiTY UN1T COST RCV <br /> Paint the walls and ceiling-one coat 230.50 SF 0.32 73.76 <br /> Paint casing-one coat 34.00 LF 0.51 17.34 <br /> Clean ductwork-Interior-Heavy clean(PER REGIST'ER) 1.00 EA 25.69 25.69 <br /> Clean and deodorize building-Ozone treatment 286.67 CF 0.03 8.60 <br /> Room Totals:Maeter Bath 125.39 <br /> Area Totals: Sleeping <br /> 2,955.35 SF Walls 729.31 SF Ceiling 3,684.66 SF Walls&Ceiling <br /> 713.50 SF Floor 79.28 SY Flooring 345.08 LF Floor Perimeter <br /> 0.00 SF I.ong Wall 0.00 SF Short Wall 356.06 LF Ceil.Perimeter <br /> 1,427.00 Floor Area 795.83 Total Area 2,955.35 Interior Watl Area <br /> 1,114.55 Exterior Wall Area 133.83 Exterior Perimeter of <br /> Walls <br /> Area Itema Total: Skeping 3,872.60 <br /> Room:Basement LzWaH 18'0"a 12'0"a S'0" <br /> 480.00 SF Walls 216.00 SF Ceiling 696.00 SF Walls&Ceiling <br /> 216.� SF Floor 24.00 SY Flooring 60.00 I,F Floor Perimeter <br /> 144.00 SF Long Wall 96.00 SF Short Wall 60.00 LF Ceil.Perimeter <br /> DE5CRIPTION QUANTITY UNiT COST RCV <br /> Paint the walls-one coat 480.00 SF 0.32 153.60 <br /> 102104-00001 Page: 14 <br />