Laserfiche WebLink
DuAll Service Contractors <br /> WOJCIESZAK,JOY 10/27/20U4 <br /> �"'e'� Room:Master BR <br /> �+�() 13•2 � <br /> �, � b <br /> -i �.a � � 569.22 SF Walls 235.32 SF Ceiling <br /> 1 ( I 804.54 SF Walls&Ceiling 235.32 SF Floor <br /> � 1 f 26.15 SY Flooring 70.75 LF Floor Perimeter <br /> "�10�� � 73.17 LF Ceil.Perimeter <br /> s' a�r'" �' � <br /> N <br /> N <br /> GOi�t <br /> DESCRIPTION QUANTITY UNTT COST RCV <br /> Dust cantrol barrier per square foot 20.00 SF 0.51 10.20 <br /> Painting-Faux(special effects)-Marbling 569.22 SF 2.88 1,639.36 <br /> The walls ere a decorative faux paint finish. The cost to repaint these walls will reflect invoice received if price is higher than allowed here. <br /> Paint casing-one coat 34.00 LF 0.51 17.34 <br /> Clean ductwark-Interiar-Heavy clean(PER REGISTER} 2.00 EA 25.69 51.38 <br /> Clean and deodorize building-Ozone treatment 1,882.56 CF 0.03 56.48 <br /> Room Totale:Master BR 1,774.76 <br /> �8._� Room:Dreasing <br /> _ �� �r � <br /> �' " " 161.44 SF Walls 29.81 SF Ceiling <br /> °"�''� � + 191.25 SF Walls&Ceiling 29.81 SF Floor <br /> �.n N',,� 3.31 SY Flooring 19.75 LF Floor Perimeter <br /> : <br /> r sr 22.33 LF Ceil.Penmetet <br /> � <br /> DESCRIPTION QUANTITY LTNIT COST RCV <br /> Paint the walls and ceiling-one coat 191.25 SF 0.32 61.20 <br /> 102104-00001 Page: 12 <br />