My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-00234 - alarm system
Orono
>
Property Files
>
Street Address
>
O
>
Old Crystal Bay Road North
>
0795 Old Crystal Bay Road North - 28-118-23-34-0003
>
Permits/Inspections
>
2018-00234 - alarm system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:24:41 PM
Creation date
1/18/2019 3:50:20 PM
Metadata
Fields
Template:
x Address Old
House Number
795
Street Name
Old Crystal Bay
Street Type
Road
Street Direction
North
Address
795 Old Crystal Bay Road North
Document Type
Permits/Inspections
PIN
2811823340003
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TFP181 • <br /> Page 2 of 4 <br /> Physical Characteristics 1/2" NPT * r SEALING <br /> Frame Bronze ASSEMBLY <br /> Support Cup Chrome <br /> Plated Steel <br /> Guide Pins Stainless Steel <br /> FRAME �\ <br /> Deflector Bronze �� ( / CAP <br /> Compression ression Screw Brass I <br /> Bulb Glass m <br /> Cap Bronze or Copper SUPPORT <br /> Sealing Assembly Beryllium CUP WITH I BULB <br /> Nickel w/TEFLON ROLL FORMED <br /> Cover Plate Brass THREADS <br /> Retainer Brass <br /> Ejection Spring Stainless Steel <br /> I COMPRESSION <br /> Design �( SCREW <br /> GUIDE r (1{� <br /> Criteria PINS(2) i '� ' <br /> The TYCO Series RFII 5.6 K-factor, t' „ DEFLECTOR <br /> "Royal Flush II" Concealed Pendent �� (DROPPED <br /> Sprinklers are intended for fire protec- DEFLECTOR i i i i i POSITION) <br /> tion systems designed in accordance <br /> with the standard installation rules rec- <br /> ognized by the applicable Listing or SPRINKLER/SUPPORT CUP <br /> Approval agency;for example, UL List- ASSEMBLY <br /> ing is based on NFPA 13 and VdS Ap- <br /> I I <br /> proval is based on the CEA 4001. THREAD INTO P j RETAINER <br /> SUPPORT ) ( WITH THREAD <br /> For more information on LPCB and CUP UNTIL lN D O DIMPLES <br /> VdS Approvals, contact Tyco Fire Pro- MOUNTING <br /> tection Products at the following office: SURFACE IS EJECTION <br /> Enschede, Netherlands FLUSH WITH SPRING <br /> Telephone: 31-53-428-4444 CEILING <br /> Fax:31-53-428-3377 <br /> The Series RFII Concealed Pendenti <br /> Sprinklers are only listed and approved !ter , <br /> with the Series RFII Concealed Cover / <br /> Plates having a factory applied finish. SOLDER J COVER <br /> TABS(3) COVER PLATE/RETAINER PLATE <br /> NOTICE ASSEMBLY <br /> Do not use the Series RFII in applica- FIGURE 1 <br /> tions where the air pressure above MODEL RFII CONCEALED SPRINKLER <br /> the ceiling is greater than that be- ASSEMBLY <br /> low. Down drafts through the Sprin- <br /> kler/Support Cup Assembly can delay Installation Do not attempt to compensate for in- <br /> sprinkler operation in a fire situation. sufficient adjustment in the Sprinkler <br /> The TYCO Series RFII 5.6 K-factor, by under- or over-tightening the Sprin- <br /> "Royal Flush II" Concealed Pendent kler/Support Cup Assembly. Re-adjust <br /> Operation Sprinklers must be installed in accor- the position of the sprinkler fitting to <br /> When exposed to heat from a fire, the dance with this section. suit. <br /> Cover Plate, normally soldered to the General Instructions Step 1. Install the sprinkler only in the <br /> Retainer at three points, falls away topendent position with the center-line <br /> expose the Sprinkler/Support Cup Do not install any bulb-type sprinkler if of the sprinkler perpendicular to the <br /> Assembly. the bulb is cracked or there is a loss mounting surface. <br /> of liquid from the bulb. With the sprin- Step 2. Remove the Protective Cap. <br /> The Deflector — supported by the kler held horizontally, a small air bub- <br /> Guide Pins — then drops down to its ble should be present. The diameter Step 3. With pipe thread sealant ap- <br /> operational position. of the air bubble is approximately 1/16 plied to the pipe threads, hand-tighten <br /> inch (1,6 mm)for the 155°F (68°C) and the sprinkler into the sprinkler fitting. <br /> The glass bulb contains a fluid that ex 3/32 inch (2,4 mm)for the 200°F(93°C) Step 4. Wrench-tighten the sprinkler <br /> pands when exposed to heat. When temperature ratings. using only the RFII Sprinkler Wrench. <br /> the rated temperature is reached, the (Refer to Figure 3.) Apply the RFII <br /> fluid expands sufficiently to shatter the A leak-tight 1/2 inch NPT sprinkler joint Sprinkler Wrench to the Sprinkler as <br /> glass bulb, activating the sprinkler and should be obtained by applying a min- shown in Figure 3. <br /> allowing water to flow. imum to maximum torque of 7 to 14 Step 5. Replace the Protective Cap <br /> ft.-lbs. (9,5 to 19,0 Nm). Higher levels by pushing it upwards until it bottoms <br /> of torque can distort the sprinkler In- out against the Support Cup. (Refer <br /> let with consequent leakage or impair- to Figure 4.)The Protective Cap helps <br /> ment of the sprinkler. prevent damage to the Deflector and <br />
The URL can be used to link to this page
Your browser does not support the video tag.