My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
project manual-salt storage bldg-2002
Orono
>
Property Files
>
Street Address
>
S
>
Shoreline Drive
>
3880 Shoreline Drive - 17-117-23-33-0151
>
Misc
>
project manual-salt storage bldg-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:37:07 PM
Creation date
12/18/2018 2:17:38 PM
Metadata
Fields
Template:
x Address Old
House Number
3880
Street Name
Shoreline
Street Type
Drive
Address
3880 Shoreline Drive
Document Type
Misc
PIN
1711723330151
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Division O i Summary Of Work -Section O 1010 � <br /> 'The contractor shall conduct its operations so as to permit Owner and Owner's designated employees ' <br /> access to the existing building. Walks, driveways, entrances and hallways to be used by the public shall <br /> be maintained in a safe condition and shall be kept free of the Contractor's equipment,materials and <br /> debris. ' <br /> 1.12 CONTRACTOR'S SUPERVISION OF THEPROJECT <br /> Provide Project supervision per Paragraph 3.9 of the Supplementary Conditions. , <br /> 1.13 PROJECT MANAGER AND SUPERINTENDENT , <br /> 1.13.1 Refer to Pazagraph 3.9.1, 3.9.2 and 3.9.3 of the Supplementary Conditions. <br /> 1.14 SUBCONTRACTORS AND SUPPLIERS ' <br /> The Contractor shall not award any work to any Subcontractor without prior approval of the Owner <br /> and Architect. Approval will not be given unril the Contractor submits the List of Subcontractors and , <br /> major Suppliers containing such information as the Owner and Architect may re�uire concerning the <br /> proposed Subcontractor and the scope of the subcontract. (Also refer to Section 01300, Submittals.) <br /> 1.15 PROJECT MEETINGS ' <br /> Pre-Construction Meeting: After award of Contract, at a time designated by the Owner or the <br /> Architect, the Contractor, and the structural and electrical subcontractors shall attend a Pre- ' <br /> Construcrion Meeting. Procedures to be followed, critical work sequencing, submittals, coordination <br /> efforts, contract payments and similar matters will be reviewed <br /> Progress Meetings: During construction, periodic site meetings will be held with the Contractor, major ' <br /> Subcontractors, Owner, and Architect/Engineer. These meetings will be held weekly (unless job <br /> conditions do not warrant) and may be held more frequendy if job progress and needs indicate. <br /> Contractor and major Subcontractors shall have one or more responsible representatives in attendance. , <br /> Contractor shall record the "minutes" of the meeting, shall distribute the "minutes" as appropriate and <br /> shall include such minutes within the Project records. <br /> ' <br /> 1.16 MAINTAINING SERVICES AND FUNCTIONS <br /> It is essential that full Owner's services and functions are maintained throughout the construction ' <br /> period, with the minimum disturbance and disruption to the Owner's operations. The Contractor and <br /> Subcontractors shall be aware of these requirements and objectives. The Contractor shall conduct the <br /> work and develop his detailed schedule to meet these requirements and objectives. , <br /> After Owner's occupancy (full or partial) of the Project or any unit, stage, phase or area, any work <br /> remaining to be accomplished in the occupied spaces shall be done in cooperation with, and approval ' <br /> by the Owner and scheduled in advance with the Owner. In general, work in occupied areas shall be <br /> done when the space is not in use, such as after hours in public spaces when public use hours are over <br /> for the day, unless specifically approved by the Owner. Where necessary, overtime shall be used if the <br /> work cannot reasonably be accomplished during normal work periods, at no extra cost to the Owner. ' <br /> Work in occupied areas shall be performed in a manner and at such time as will not significantly <br /> interfere with, hamper or inconvenience Owner's program or functions. <br /> ' <br /> oioio-a , <br /> �PnJco o s � <br /> March 22, 2002 Project No.: 0031569 Contract No.: 0751R2 <br /> ' <br />