Laserfiche WebLink
Division O1 Summary Of Work -Section 01010 � <br /> 1. Furnish to Contractor bonds covering faithful performance of subcontracted work and payment of a ll ' <br /> obligations thereunder[when Contractor is required to furnish such bondsto Owner.] <br /> 2. I�urchase and maintain liability insurance to protect Contractor from claims for not less than the <br /> limits of liability, which Contractor is requirnd to provide to Owner. ' <br /> 1.051 'TI�OWNER <br /> The Owner of the Project is the Couniy of Hennepin,State of Minnesota. ' <br /> 1.052 TI�ARCHTI'ECT ' <br /> L.G.Fulop Architects & Planners <br /> 6650 VernonAve.S., Ste. 11� <br /> Minneapolis, MN 55436 ' <br /> 1.d53'TI�STRUCTURAL ENGINEER <br /> David Morris,P.A. , <br /> 12 S.6�'Street <br /> Eden Prairie, MN 55402 ' <br /> 1.054 TI�ELECTRICAL ENGINEER <br /> Steen Engineers,Inc. ' <br /> 7204145�'Lilac Drive <br /> Brooklyn Center,MN 55430 <br /> 1.05 CONTRACTOR USE OF PREMISES ' <br /> A. Contractor shall limit useof premises[for Work, for storage, and for access,]to allow: <br /> 1. Owner occupancy. ' <br /> 2. Public usage,as identified by Owner. <br /> B. Coordinate use of premises with Owner's Representative. <br /> C. Assume full responsibility for protection and safekeeping of products under this Contract. ' <br /> D. Obtain and pay for use of additional storage or work areas needed for operations underthis Contract. ' <br /> 1.06 OWI���OCC�JPAf1T�Y <br /> A. Owner will occupy part of site during entire rnnstrucrion period for conduct of his normal operations. ' <br /> Cooperate with Owner in scheduling operations to minimize conflict with Owner usage. <br /> B. Owner shall cooperate and make available areas necessary to complete the work. The Owner will ' <br /> remove items noted"to be relocated by Uwner"or any portable equipment in the construction area. <br /> 1.07 WORK BY OWNER <br /> A. Items noted"NIC"or"'BO"will be furnished by Owner under sepazate contract. , <br /> B. Incase of Uwner-bought equipment,requiring installation or hookup by the Contractor as noted in the ' <br /> contract documents,the turnover of such equipment into the care, custody and control of the Contractor <br /> shall occurupon delivery. <br /> 01010-2 ' <br /> p� n 1 e <br /> Mazch 22, 2002 Project No.: Oa31569 Conuact No.: 0751R2 <br /> ' <br />