My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
project manual-salt storage bldg-2002
Orono
>
Property Files
>
Street Address
>
S
>
Shoreline Drive
>
3880 Shoreline Drive - 17-117-23-33-0151
>
Misc
>
project manual-salt storage bldg-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:37:07 PM
Creation date
12/18/2018 2:17:38 PM
Metadata
Fields
Template:
x Address Old
House Number
3880
Street Name
Shoreline
Street Type
Drive
Address
3880 Shoreline Drive
Document Type
Misc
PIN
1711723330151
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> Hennepin County Special Requirements Section 00800 - SUPPLEMENARY CONDITIONS <br /> 1/2/02 Edition � <br /> Page 2 3 of 32 <br /> commitment for utilization if the utilization percentage meets the goal established by � <br /> the Contract. <br /> 4. The Contractor must receive approval from the Hennepin County Project Manager � <br /> and Hennepin County's TCS before making substitution for, or deviation from any <br /> certified SBE firms offered in the original proposal, or if Contractor is under goal,any ' <br /> Subcontractors/Suppliers originally proposed. <br /> 5. The Contractor's commitment to a specified participation level is to meet the required � <br /> participation levels, and is not intended and shall not be used to discriminate against <br /> any qualified company or group of companies. <br /> 6. Only SBEs that are recognized as certified by the Hennepin County SBE Program will , <br /> be considered eligiblefor inclusion in the Contractor's goals. <br /> 7. Hennepin County's TCS will make the final deternunation with regards to SBE � <br /> compliance of proposals received. Contract TCS at (612) 348-5960 with any <br /> questions regarding SBE certification or SBE participation compliance. � <br /> 8. With notification that a Contractor is the Apparent Low Bidder(s), they will be <br /> required to submit a Hennepin County SBE Program Prime Contractor's Participation ' <br /> Form, and Subcontractor's Participation Form (if applicable) to Hennepin County <br /> Purchasing listing the Subcontractors that they will have on the job and indicating the <br /> contract amount of each, etc., per the form. This list sha.11 indicate the � <br /> Subcontractors/Suppliers that comprise the Bidder's SBE participarion and will <br /> become part of the Contract. If any Bidder is unable to meet the SBE required <br /> participarion levels,it shall submit a detailed statement of its good-faith efforts. The � <br /> good-faith effort statement shall identify all efforts made prior and subsequent to Bid <br /> Opening to achieve the desired result. Failure to meet either the required SBE ' <br /> participation levels or demonstrate sufficient good-faith efforts may be cause to deem <br /> a Bidder non-responsive. <br /> 9. The Hennepin County Project Manager will review the Subcontractors listed by ' <br /> Prime Contractors to ascertain whether the Subcontractors in question are capa.ble and <br /> have the capacity to provide the work noted. <br /> 13.9.3 CONTRACTOR/SUBCONTRACTOR REPORTING REQUIItEMENTS ' <br /> Contractors, as required in Article 13 of Section 00120. Supplementarv Instructions to ' <br /> Bi.dders. shall submit SBE Partici�tion Reports to TCS indicating their total contract valu�e <br /> and the breakdown of all self-performed and subcontracted work—including both certified ' <br /> SBEs and non-SBEs. The report shall detail each subcontract by labor, material and <br /> subcontracts of all tiers, which shall be sunilazly detailed. The report shall be submitted <br /> Suppl Conds-23 , <br /> HF.NT�TRPiNC'ni 1NTY Orono Salt SWraee <br /> March 22,2002 Project No.: 0031569 Contract No.: 0751R2 <br /> ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.