' <br /> Hennepin County Special Requirements Section 00800 - SUPPLEMENARY CONDITIONS <br /> 1/2/02 Edition ' <br /> Page 9 of 32 <br /> Delete the first sentence of Subparagraph 7.3.6 and substitute the following: ' <br /> If the Contractor does not respond promptly or disagrees with the method for adjustment in , <br /> the Contract Sum, the method and the adjustment sha11 be determined by the Architect on <br /> the basis of reasonable expenditures and savmgs of those performmg the Work attnbutable <br /> to the change, including, in case of an increase in the Contract Sum, an allowance for ' <br /> overhead and profit as stated in Clause 7.3.3.6. <br /> Change Clauses 7.3.6.1, 7.3.6.2, 7.3.6.3, 7.3.6.4, and 7.3.6.5 to read as follows: ' <br /> 7.3.6.1 Costs of labor including social security, old age and unemployment insurance, fringe benefits <br /> required by agreement or custom, and workers compensation insurance, all as directly <br /> attributable to the change; ' <br /> 7.3.6.2 Costs of materials, supplies and equipment, including cost of transportation, whether <br /> incorporated or consumed,all as directly attributable to the change; ' <br /> 7.3.6.3 Rental costs of machinery and equipment, exclusive of hand tools, whether rented from the <br /> Contractor or others, all as directly attributable to the change;and ' <br /> 7.3.6.4 Costs of permit fees, and sales, use or similaz taxes related to the Work, all as directly <br /> amibuta.ble to the change. , <br /> 7.3.6.5 Addrtional cost of supervision and field o�ice personnel directly attributable to the change <br /> only when due to approved extension of Contract time. <br /> Add the followin to Sub a a h'7.3.8: ' <br /> g P� S�' P <br /> Adjustments to the Contract Time shall reflect only the additiona.l time directly attributable ' <br /> to the Change in the Work. <br /> Add the following to Paragraph to Article 7: ' <br /> 7.5 AUTHORIZATIONTO PROCEED WITHA CONSTRUCTION CHANGE <br /> 7.5.1 An Authorization to Proceed with a Construction Chan e is a written instrument re ared ' <br /> g P P <br /> by the Owner or the Architect, acting on behalf of the Owner, and signed by the Owner <br /> authorizing the Contractor to proceed with a Change to the Work as submitted by the ' <br /> Contractor in written proposal form. Work will be authorized by a Lump Sum, Negotiated <br /> Price, Time and Materials, Unit Price(s), or other method as agreed upon. The , <br /> Authoriza.tion to Proceed with a Construction Change is intended to expedite the change <br /> approval process, and �mplementation of the Work by the Constractor denotes acceptance <br /> of the Authorization. Upon completion of the Work, an aggregate of Authorizations to ' <br /> Proceed with a Construction Change will be incorporated into a Change Order, per <br /> Subpazagraph 7.2.1. <br /> Suppl Conds-9 ' <br /> HENNEPINCOUNTY Orono Salt Storage <br /> March 22,2002 Project No.: 0031569 Contract No.: 0751R2 <br /> ' <br />