My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
project manual-salt storage bldg-2002
Orono
>
Property Files
>
Street Address
>
S
>
Shoreline Drive
>
3880 Shoreline Drive - 17-117-23-33-0151
>
Misc
>
project manual-salt storage bldg-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:37:07 PM
Creation date
12/18/2018 2:17:38 PM
Metadata
Fields
Template:
x Address Old
House Number
3880
Street Name
Shoreline
Street Type
Drive
Address
3880 Shoreline Drive
Document Type
Misc
PIN
1711723330151
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' <br /> Hennepin County Special Requirements Section 00800 - SUPPLEMENARY CONDITIONS <br /> , 1/2/02 Edition <br /> Page 8 of 3Z <br /> ' both additions and credits covering related Work or substitutions are involved in any one <br /> change,the allowance for overhead and profit shall be figured on the basis of net increase, if <br /> ' any. <br /> .2 By unit prices stated in the Contract Documents or subsequently agread upon. Unit prices <br /> ' shall cover all of the Contractor's costs for labor, materials, equipment and related services <br /> including such costs for subcontracted work and the Contractor's overhead and profit. <br /> ' .3 By cost to be determined in a manner agreed upon by the parties and a mutually acceptable <br /> fixed or percentage fee. <br /> , .4 By the method provided in Sub�ragraph 73.6. <br /> .5 The cost of a change determined under the methods in Clauses 7.3.3.1, 7.3.3.3 and 7.3.3.4 <br /> , shall include all costs direetly related to the change,and the Contractor shall itemize these <br /> costs and provide appropriate supporting data as may be necessary to establish their <br /> correctness. All indirect costs whether incurred on or off site sha11 be included in the <br /> , Contractor's overhead. Indirect costs shall include such items as local telephone use, <br /> coordination of trades and/or utilities, site inspection, photography, clerical support, <br /> estimating,postage, handling,general carthage and/or cleanup and field coordination. <br /> ' .6 In the case of Work authorized under Clauses 73.3.1 7.3.3.3 and 7.3.3.4 a reasonable <br /> , , <br /> ' allowance for overhead and profit shall be not more than ten (10%) percent of the net cost <br /> of Work accomplished by the Contractor's own forces, five (5%) percent of the net cost of <br /> Work accomplished by Subcontractors and five(5%)percent of the net cost of materials and <br /> � equipment. Subcontractors, sub-subconttactors and subsequent tiers of contractors may <br /> add an allowance of not more than ten (10%) percent of the net cost of the work <br /> accomplished by their own forces to cover their overhead and profit, five (5%) percent of <br /> ' the net cost of the Work accomplished by their Sub-contractors and five(5%)percent of the <br /> net cost of materials and equipment. Further, as a condition for the Owner's authorization <br /> of a five (5%) percent allowance for work of any lower tier contractor, as aforesaid, the <br /> ' Owner may request the Contractor and/or any pertinent lower tier contractor to provide to <br /> the Owner detailed, written information to establish to the Owner's satisfaction the actual <br /> relationship between the contractor and any lower tier contractor. Such information shall be <br /> ' provided promptly to the Owner following the request therefor. <br /> .7 Cost of additional insurance and performance bond coverage related to the change shall not be <br /> ' included by the Contractor as part of the cost of each change,but shall be compensated for <br /> on the basis of actual cost by means of a single Change Order prior to Project Close-Out. <br /> ' <br /> ' Suppl Conds-8 <br /> I�INEPINCOUNI'Y O�+ono Salt 4tnra� <br /> March 22,2002 Project No.: 0031569 Contract No.: 0751R2 <br /> ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.