My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
project manual-salt storage bldg-2002
Orono
>
Property Files
>
Street Address
>
S
>
Shoreline Drive
>
3880 Shoreline Drive - 17-117-23-33-0151
>
Misc
>
project manual-salt storage bldg-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:37:07 PM
Creation date
12/18/2018 2:17:38 PM
Metadata
Fields
Template:
x Address Old
House Number
3880
Street Name
Shoreline
Street Type
Drive
Address
3880 Shoreline Drive
Document Type
Misc
PIN
1711723330151
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br /> Hennepin County Special Requirements Section 00800 - SUPPLEMENARY CONDITIONS <br /> 1/2/02 Edition ' <br /> Page 7 of 32 <br /> Change Subparagraph 7.1.2 to read as follows: ' <br /> 7.1.2 A Change Order or Authorization to Proceed with a Construction Change shall be based ' <br /> upon agreement among the Ovmer, Contractor and Architect; a Construction Change <br /> Directive requires agreementby the Owner and Architect and may or may not be agreed to <br /> by the Contractor; an order for a minor change in the Work may be issued by the Architect ' <br /> alone. In the event the Contractor ignores the Architect's directions to correct defective or <br /> non-complying work, or if previously undetected defective work causes the Owner expense, <br /> the Architect and Owner, if in agreement and notwithstanding the Contractor's disagreement, ' <br /> may execute a Change Order to compensate the Ovmer for the cost of such corrective work <br /> or repair, from the amount owed the Contractor. <br /> Change Subparagraph 7.1.3 to read as follows: , <br /> 7.1.3 Changes in the Work shall be performed under applicable provisions of the Contract � <br /> Documents, and the Contractor shall proceed promptly, unless otherwise provided in the <br /> Change Order, Construction Change Directive, order for a minor change in the Work, or <br /> Authorization to Proceed with a Construction Change. ' <br /> 7.2 CHANGE ORDERS <br /> Chan e Su a a h 7.2.2 to read as follows: , <br /> g bP�' Sr P <br /> 7.2.2 Methods used in determining adjustments to the Contract Sum shall adhere to the ' <br /> requirements listed in Subparagraphs 7.3.3 and 7.3.6. <br /> Add the following subparagraph: , <br /> 7.2.3 Change Orders shall be prepared using AIA Document G701. Computer generated forms ' <br /> may not be substituted, wiless AIA software is used to produce a facsimile. <br /> 7.3 CONSTRUCTION CHANGE DIRECTIVES ' <br /> Change Subparagraph 7.3.3 to read as follows: <br /> 7.3.3 If the Change Order or the Construction Change Directive provides for an adjustment to the ' <br /> Contract Sum,the adjustment shall be based on one of the following methods: <br /> .1 By mutual accepta.nce of a lump sum properly itemized and supported by sufficient ' <br /> substantiating data to permit evaluation. A lump sum for an increase in the Contract Sum <br /> may contain a reasona.ble allowance for the Contractor's overhead and profit. No allowance � <br /> for overhead and profit will be allowed if the change results in a net decrease in cost. When <br /> Suppl Conds-7 ' <br /> HENIVEPINCOLJN'TY Orono Salt Storage <br /> March 22,2002 Project No.: 0031569 Contract No.: 0751R2 <br /> ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.