Laserfiche WebLink
, Contractor shall reimburse the Engineer for all additional reviews on a time and <br /> material basis. No equipment shall be released for shipment or installed prior to <br /> ' final approval by the Engineer. <br /> O. The Contractor shall provide all necessary temporary power and lighting to allow <br /> ' other Contractors and Subcontractors to perform their work. Prior to submitting a <br /> bid for this Project, contact the General Contractor to determine the type of <br /> equipment to be used in the performance of the work. The Electrical Bid shall <br /> ' include all labor and materials required to provide and maintain a complete <br /> temporary power and lighting system. <br /> � P. The Contractor shall regularly clean their work area of debris. Removal of all <br /> Contractor generated debris and rubbish caused by their work shall be at the <br /> Contractor's expense. <br /> � . The Contractor shall ro erl rotect all e ui ment from da r' <br /> Q p p y p q p mage du ing <br /> , construction. Thoroughly clean all fixtures, equipment, panels and other supplied <br /> materials. Make all necessary repairs and apply touch up paint as required prior <br /> to final inspection and contract close out. <br /> ' R. All work and materials shall comply with the latest edition of the National <br /> Electric Code and all other applicable state and local codes. <br /> ' S. Contractor shall provide all material and wiring methods as required by the <br /> National Electric Code for each environment as indicated on the architectural <br /> ' drawings, i.e. explosion proof, wet or damp locations, caustic or corrosive <br /> conditions, etc. <br /> ' T. Materials and equipment shall be installed in a neat and workmanlike manner by <br /> skilled craftsmen. <br /> ' U. Delivery of all materials and equipment shall be in accordance with the overall <br /> Project schedule. The Contractor shall closely coordinate all deliveries with other <br /> , Contractors and the Engineer. <br /> V. For materials and equipment specified by description only, the Contractor shall <br /> , provide materials or equipment suitable for the purpose intended. These shall be <br /> in conformance with all governing codes, these Specifications and normal trade <br /> practice. <br /> � W. For materials or equipment specified by manufacturer's name and catalog <br /> number, the Contractor shall provide the item specified. The Contractor may <br /> ' submit materials and equipment for prior approval to the Engineer. All prior <br /> approvals must be received by the Engineer at least seven working days prior to <br /> bid, <br /> ' Xe T'he Contractor shall full instruct the Owner in the o eration of electrical <br /> Y P <br /> ' equipment prior to final close out. <br /> 052501 I,GF 102 3/14/02 <br /> 16010 - 3 <br /> ' <br />