Laserfiche WebLink
� <br /> � <br /> 4. Install: Shall mean to schedule for delivery, deliver or have delivered to r <br /> � the site, store as directed, protect from damage, set in place, make all <br /> ': necessary final connections, test as required and turn over to the Owner in <br /> � full operating condition. , <br /> ' S. Provide: Shall mean furnish and install. <br /> 6. Connect: Shall mean to bring electrical service and/or control wiring to � <br /> equipment, make all final connections, provide all necessary <br /> ! miscellaneous materials required and do final check out to ensure proper <br /> equipment connections. , <br /> G. The Contractor shall visit the site and familiarize themselves with the conditions <br /> affecting Division 16000 work. No additional costs to the Owner shall be allowed 1 <br /> for items verifiable during site visits. <br /> �-I. The Contractor shall provide office space and storage for materials and equipment ' <br /> supplied as required. Location shall be as directed by the General Contractor or <br /> the Architect/Engineer. � <br /> �. The Contractor shall be a licensed contractor in the State that the project is being <br /> constructed and shall employ all Licensed Professional Tradesmen required for ' <br /> each type of work covered under these Drawings and Specifications. <br /> J. The Contractor shall procure all necessary certificates and permits and pay all � <br /> required fees. Utility costs, if any, shall also be the responsibility of the <br /> Contractor. Contractor shall furnish a certificate of final inspection and approval <br /> from all enforcement agencies to the Owner. � <br /> K. The work included under Division 16000 shall consist of furnishing all labor, <br /> materials, equipment, tools and services for the complete installation of the ' <br /> Electrical System as indicated on the Drawings and called for in these <br /> Specifications. <br /> ' <br /> L. Specific materials and equipment specified is intended to establish a minimum <br /> standard of required quality. Where specified materials and equipment fail to � <br /> meet minimum standards of existing federal, state and local codes and ordinances, <br /> the governing codes and ordinances shall prevail. <br /> 1�1. The Contractor shall furnish and install all minor miscellaneous materials , <br /> necessary for the complete electrical installation. <br /> N. Within fifteen days after the award of the Contract, the Contractor shall submit for ' <br /> ap�roval eight sets of shop drawings on all major electrical equipment. These <br /> shop drawings shall cover such items as lighting fixtures, lamps, disconnects, ' <br /> fuses, starters, MCC sections, switchgear, devices, plates, panels, contactors etc. <br /> The Contractor shall thoroughly review each item for compliance with these <br /> . Specifications prior to submitting them to the Engineer, making any necessary � <br /> corrections. Each shop drawing set shall be stamped, signed and dated indicating <br /> Contractor review. If the Contractor fails to properly review shop drawings, the ' <br /> 05250Y LGF102 3/14/02 <br /> 16010 - 2 <br /> , <br />