My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
project manual-salt storage bldg-2002
Orono
>
Property Files
>
Street Address
>
S
>
Shoreline Drive
>
3880 Shoreline Drive - 17-117-23-33-0151
>
Misc
>
project manual-salt storage bldg-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:37:07 PM
Creation date
12/18/2018 2:17:38 PM
Metadata
Fields
Template:
x Address Old
House Number
3880
Street Name
Shoreline
Street Type
Drive
Address
3880 Shoreline Drive
Document Type
Misc
PIN
1711723330151
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� DIVISION 02 Section 02900 - Landscaping <br /> , <br /> ' SECTION 02900 <br /> LANDSCAPING <br /> � PART 1.- GENERAL <br /> , Z.o1 WORK INCLUDED <br /> a. s�a��. <br /> � B. Sodding. <br /> D. Mulching and Edger. <br /> � 1.02 RELATED DOCUMENTS <br /> A. The drawings and provisions of the Contract including the General and Supplementary <br /> � Conditions,and Division 1-General Requirements Specification Sections,apply to the <br /> Work of this Section. <br /> 1.03 RELATED WORK <br /> � A. Section 01025-Measurement and Payment: Unit Costs. <br /> � B. Section 01300-Submittals: Recycled Materials Content Summaries. <br /> C. Section 02300-Earthwork:Finish Grading. <br /> , 1.04 SUBMITTALS <br /> A.Submit a soil fertility test of the planting soil for approval by the Architect prior to delivery <br /> � of soil to the project site.Test reports shall indicate the location of the source for soil. <br /> B. Upon completion of the work, submit to the Owner a description for the maintenance of <br /> � plant material. <br /> C. Contractor shall submit with each request for payment a summazy of the quantity of <br /> materials with recycled content utilized on the project. <br /> ' 1.05 QUALTTY ASSURANCE <br /> 1 A. For standard products, the manufacturer's analysis will be acceptable. For all other <br /> materials,analysis shall be by a recognized laboratory. <br /> � B.Soils shall be analyzed for their composition and fertility in sustaining plant growth and <br /> health. <br /> C. Seeding and sodding shall be furnished in the variety, size, grade and quality indicated. <br /> � Specifications and planting plans shall be strictly adhered to and no changes or <br /> substitutions will be allowed prior to bidding without written permission of the Owner. If <br /> discrepancies exist within the drawings, plan quantities shown shall supersede amounts <br /> � indicated elsewhere. <br /> 02900- 1 <br /> HENNEPIN COUNTY Orono Salt Storage <br /> � March 22,2002 Project No.:0031569 Contract No.:0751 R2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.