My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
project manual-salt storage bldg-2002
Orono
>
Property Files
>
Street Address
>
S
>
Shoreline Drive
>
3880 Shoreline Drive - 17-117-23-33-0151
>
Misc
>
project manual-salt storage bldg-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:37:07 PM
Creation date
12/18/2018 2:17:38 PM
Metadata
Fields
Template:
x Address Old
House Number
3880
Street Name
Shoreline
Street Type
Drive
Address
3880 Shoreline Drive
Document Type
Misc
PIN
1711723330151
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> DIVISION O1 SUBMITTALS-Section 01300 <br /> Standard information prepared without specific reference to the Project is not considered to be ` <br /> shop drawings. <br /> B. Infonnation required on shop drawings include: identification of specific products and materials, , <br /> which are included in the work, dimensions, compliance with specified and pertinent standa�ds, <br /> and notarions of coordination requirements with other work. Provide special notations of <br /> dimensions that have been established by field measurements. On the shop drawings highlight, � <br /> encircle or otherwise indicate deviations from the contract documents. <br /> C. Review shop drawings and approve by ai��cing approval stamp and signature. Then submit t o � <br /> ArchitectlEngineer for review. State date required for return if immediate action is required. <br /> Shop drawings without Contractor's approval will not be reviewed by ArchitectlEngineer, nor <br /> returned. Do not include the Owner in the shop drawing review and approval schedule, except � <br /> where noted elsewhere herein to the contrary. Do not allow installers, materiai suppliers or <br /> product representatives to submit directly to the Architect/Engineer. <br /> D. Allow 2 (two) weeks for initial review. Allow more time if Architect/Engineer must delay , <br /> processing to permit coordination. Allow 2 (two) weeks for reprocessing, The Contractor shall <br /> allow for this time period when scheduling his/her work. <br /> E. Do not reproduce contract documents or copy standard printed information as the basis for shop ' <br /> drawings.Shop drawings submitted in such manner will not be reviewed by the Architect/Engineer, <br /> and will not be returned to the Contractor. <br /> F. Refer to Division - 15 and Division - 16 sections for additional general requirements applicable t o � <br /> shop drawings for mechanical and electrical work respecrively. <br /> G. Coordination Drawings: Provide coordination drawings where required for the integration of the � <br /> work, including wark first shown in detail on shop drawings or product data. Show sequencing <br /> relationship of the separate units of the work, which must interface to fit in the space provided, , <br /> or function as indicated. Coordinarion Drawings are considered shop drawings and must be <br /> definitive in nature. <br /> H. Do not permit shop drawing copies without the appropriate final action mazking by the <br /> Architect/Engineer to be used in connection with this work. � <br /> 109. PRODUCT DATA <br /> A. Product Data includes standard printed information that has not been specifically prepared for ' <br /> this project, including but not limited to the following items: <br /> 1. Manufacturer's product specifications and installation instructions. � <br /> 2. Standard color charts, unless noted contrary in individual sections. <br /> 3. Catalog cuts. <br /> 4. Roughing-in diagrams and templates. ' <br /> 5. Standazd wiring diagrams. <br /> 6. Printed performance curves. <br /> 7. Standard product operating and maintenance manuals. � <br /> General information required specifically as product data includes manufacturer's standard printed <br /> recommendarions for application and use, compliance with the recognized standards of trade <br /> associations and testing agencies, and the application their labels and seals (if any), special notation � <br /> of dimensions which have been verified by way of field measurements, and special coordination <br /> requirements for interfacing the product or system with other work. <br /> 01300-5 � <br /> HEIJNEPINCOiJN'TY Orono Salt Storaee <br /> Maz�b 22, 2pp2 Project No.: 0031569 Contract l�to.: 0751R2 <br /> , <br />
The URL can be used to link to this page
Your browser does not support the video tag.