My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
project manual-salt storage bldg-2002
Orono
>
Property Files
>
Street Address
>
S
>
Shoreline Drive
>
3880 Shoreline Drive - 17-117-23-33-0151
>
Misc
>
project manual-salt storage bldg-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:37:07 PM
Creation date
12/18/2018 2:17:38 PM
Metadata
Fields
Template:
x Address Old
House Number
3880
Street Name
Shoreline
Street Type
Drive
Address
3880 Shoreline Drive
Document Type
Misc
PIN
1711723330151
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> DIVISION 01 SUBNIITTALS-Section 01300 <br /> � <br /> B. Collect required product data into a single submittal for each unit of work or system. Mazk each <br /> ' copy to show which choices and oprions are applicable to the project. Where product data has <br /> bcen printed to include information on several similar products, some of which are not required <br /> for use on the project, or aze not included in this submittal, mark the copies cleazly to show that <br /> such information is not applicable. <br /> � C.Product data submittal is required for information and record, and to determine that the products, <br /> materials and systems comply with the provisions of the contract documents. <br /> , 1. Except as otherwise indicated in other sections of these specifications, submit 6 copies of <br /> each required product data submittal. <br /> ' 2. The Architect/Engineer will retain 3 copies (one for the Owner) and will return the other <br /> mazked with "Action" and conections or modifications as required. <br /> 3. Do not submit product data or allow its use on the project, until Contractor has confirmed <br /> compliance with the requirements of the contract documents. <br /> � D. The Architect/Engineer will require 2 (two) weeks for initial review. Allow more time if <br /> ArchitectlEngineer must delay processing to permit coordination. The Contractor shall allow for <br /> � this time period when scheduling his/her work. <br /> E. Final Distribution: Furnish copies of Product data to Subcontractors, installers, suppliers, <br /> fabricators, manufacturers, governing authorities and others as required for proper performance of <br /> � the work. Show distribution on transmittai forms. <br /> ' 109. PRODUCTS LLST <br /> A. The Products List shall include the following items for each major specification section: <br /> � 1. Numerical specification section number. <br /> 2. Brand names andlor manufacturers of materials and equipment included under each <br /> specification section. <br /> 3. Name, address, telephane number and contact person of material Supplier and <br /> � Subcontractor who is furnishing and installing each major product being incorporated in <br /> the work. <br /> ' B. The order of the list is that of the Table of Contents of the Project Manual. Identify each item <br /> with the number and title of the respective specification section. <br /> C. This Praducts List may be combined with or be an expansion of the Subcontractor/ Supplier List <br /> � which may be submitted at an earlier date as requireri. <br /> ' 110. SAMPLES <br /> A. Submit samples for the Architect/Engineer's visual review of general kind, color, pattern, and <br /> ' texture, and for a final check of the coordination of these characteristics with other related <br /> elements of the work. Accompany samples with a letter of submittai, manufacturer's brochures, <br /> shop drawings, installation instructions or other supporting information. At the Contractor's <br /> option and depending upon the nature of the anticipated response from the ArchitectlEngineer, <br /> � the initial submittal of samples may be either preliminary or final submittal. <br /> ' 01300-6 <br /> H�VVNEPINCOiJIVTY Orono Salt Storaee <br /> March 22, 2002 Project No.: 0031569 Contract No.: 0751 R2 <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.