My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: proposed addition
Orono
>
Property Files
>
Street Address
>
S
>
Shoreline Drive
>
3333 Shoreline Drive- 20-117-23-11-0024
>
Correspondence
>
Re: proposed addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:47:45 PM
Creation date
11/30/2018 12:16:46 PM
Metadata
Fields
Template:
x Address Old
House Number
3333
Street Name
Shoreline
Street Type
Drive
Address
3333 Shoreline Drive
Document Type
Correspondence
PIN
2011723110024
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> -Remove the perimeter floor tile as per the plan and dispose <br /> -Repair the concrete as needed <br /> -Furnish and install the new floor tile as specified. <br /> -The customer is responsible to strip and refinish floor after installation <br /> -Also includes the installation of field tile in the two offices and the break <br /> room. <br /> -No base noted on plans <br /> -Planned to be done as night work <br /> -Check stand Area: <br /> -Furnish and install Amtico `Stratica' as per plan, in the front <br /> checkstand area. Includes the removal and disposal of the existing tile, prep and installation of the <br /> new tile with the proper adhesives. <br /> B. Interior Work-Remodeling/Repair <br /> 1. Break room: <br /> -Replace the ceiling tile, and clean the grid in the break room, reset the <br /> existing lighting and sprinkler heads <br /> -Remove and dispose of the e�sting cabinet and counter top. Furnish and <br /> install approximately 6'0" of new melamine or similar upper and lower <br /> cabinets. These will be a simple kitchen style cabinet with washable surfaces <br /> inside and out, with a plastic laminate counter top and back splash. <br /> -Reinstall the e�sting sink and faucet <br /> -provide new coat hook racks <br /> -Paint the walls, two coats latex paint <br /> -Furnish and install new vinyl base <br /> -new lockers available upon request <br /> 2. Bathrooms: <br /> -Remove, paint and reinstall the existing partitions <br /> 3. Deli Service Area: <br /> -Rotisserie Area <br /> -Furnish and install a 120" by 48" by 27" high stainless steel grease <br /> hood, welded ducting and roof top exhaust. Includes 4,000 CFM <br /> make up air unit with new gas line from the meter (e�sting is not <br /> large enough)and appropriate ductwork. Includes roofing crane and <br /> gas hook up for the new rotisserie. <br /> -Install hood Ansul fire suppressant system and relocate one fire <br /> sprinkler head as needed. <br /> -Frame, sheetrock and fire tape a double wall duct enclosure as <br /> per code <br /> -Remove the e�cisting cabinets and dispose. Install the customers' tables <br /> -Wire the make up air system, exhaust hood, fire in the hood controls, move <br /> lights, gas shut down system and rotisserie with shut down system <br /> 4. Produce Prep Area: <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.