Laserfiche WebLink
i� <br /> -Remove a11 of the upper shelves, plywood as needed <br /> -Demo the store room walls back to the main wall and dispose <br /> -Frame a new return air duct enclosure, sheetrock and tape as needed <br /> -Frame a new ceiling drop wa11 above and sheetrock. <br /> -Cover a11 wa11s with glass board as per code <br /> -Epoxy paint the rear concrete block wall, paint any exposed painted surfaces <br /> as needed. <br /> -Furnish and install a new washable 2x4 suspended ceiling <br /> -Furnish and install a new VCT floor with vinyl base. <br /> -Provide a stainless steel base at the exterior wa11 of the two coolers <br /> -Furnish and install four 2x4 lay in flourescent lights <br /> -Lower the existing unit heater and a11 associated piping and electrical <br /> -Install the customer's shelving on the back wall (only) <br /> 5. Trenching, if required by the refrigeration company under separate contract. <br /> II. Egterior Work: <br /> Exterior Work based on plans dated, September 20, 2001 <br /> A. Egterior Parapet watls; <br /> -The new parapet wa11s will be framed on top of the existing walls, then covered with <br /> plywood. <br /> -The parapet walls will be framed to include a sloped roof system with a back wall <br /> resting on the existing roof system. The rear wall will be cut into the existing roofing, <br /> and will sit on the roof deck metal, near the nearest steel beam. <br /> -The existing built-up roofing will be flashed and repaired as needed at the back wa11s <br /> of the new facade. We have estimated that the entry area will result in a 5'wide wa11 <br /> and the bagger's area will have a 3'0" wide wall. <br /> -A standing seam roof will be installed on the sloped roof sections on both wa11s. - <br /> Matching roof cap will be installed across the balance of the front of the store. The <br /> balance of the existing roof cap will be painted to match the new. <br /> -Steel horizontal lap siding and trim will be installed across the front face of the <br /> sections as per the drawings. <br /> -Steel soffit material will be installed across the underside of the soffits <br /> -The four columns will be framed to the proper height and covered with plywood. <br /> -An EFIS system will be applied to the balance of the existing block columns <br /> including the new framed walls. <br /> -Install the owner's four shoebox lights and two gooseneck lights. <br /> B. Painting; <br /> -Power wash the building <br /> -Apply latex top coat by spray painting two coats of latex paint <br /> -Repaint the e�sting painted doors <br /> 3 <br />