My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Re: proposed addition
Orono
>
Property Files
>
Street Address
>
S
>
Shoreline Drive
>
3333 Shoreline Drive- 20-117-23-11-0024
>
Correspondence
>
Re: proposed addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:47:45 PM
Creation date
11/30/2018 12:16:46 PM
Metadata
Fields
Template:
x Address Old
House Number
3333
Street Name
Shoreline
Street Type
Drive
Address
3333 Shoreline Drive
Document Type
Correspondence
PIN
2011723110024
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i� <br /> -Remove a11 of the upper shelves, plywood as needed <br /> -Demo the store room walls back to the main wall and dispose <br /> -Frame a new return air duct enclosure, sheetrock and tape as needed <br /> -Frame a new ceiling drop wa11 above and sheetrock. <br /> -Cover a11 wa11s with glass board as per code <br /> -Epoxy paint the rear concrete block wall, paint any exposed painted surfaces <br /> as needed. <br /> -Furnish and install a new washable 2x4 suspended ceiling <br /> -Furnish and install a new VCT floor with vinyl base. <br /> -Provide a stainless steel base at the exterior wa11 of the two coolers <br /> -Furnish and install four 2x4 lay in flourescent lights <br /> -Lower the existing unit heater and a11 associated piping and electrical <br /> -Install the customer's shelving on the back wall (only) <br /> 5. Trenching, if required by the refrigeration company under separate contract. <br /> II. Egterior Work: <br /> Exterior Work based on plans dated, September 20, 2001 <br /> A. Egterior Parapet watls; <br /> -The new parapet wa11s will be framed on top of the existing walls, then covered with <br /> plywood. <br /> -The parapet walls will be framed to include a sloped roof system with a back wall <br /> resting on the existing roof system. The rear wall will be cut into the existing roofing, <br /> and will sit on the roof deck metal, near the nearest steel beam. <br /> -The existing built-up roofing will be flashed and repaired as needed at the back wa11s <br /> of the new facade. We have estimated that the entry area will result in a 5'wide wa11 <br /> and the bagger's area will have a 3'0" wide wall. <br /> -A standing seam roof will be installed on the sloped roof sections on both wa11s. - <br /> Matching roof cap will be installed across the balance of the front of the store. The <br /> balance of the existing roof cap will be painted to match the new. <br /> -Steel horizontal lap siding and trim will be installed across the front face of the <br /> sections as per the drawings. <br /> -Steel soffit material will be installed across the underside of the soffits <br /> -The four columns will be framed to the proper height and covered with plywood. <br /> -An EFIS system will be applied to the balance of the existing block columns <br /> including the new framed walls. <br /> -Install the owner's four shoebox lights and two gooseneck lights. <br /> B. Painting; <br /> -Power wash the building <br /> -Apply latex top coat by spray painting two coats of latex paint <br /> -Repaint the e�sting painted doors <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.