Laserfiche WebLink
Eclectic Spalon <br /> Plumbing <br /> Plan No.PLB 1102-00114 <br /> Page 4 <br /> February 25, 2011 <br /> 3. The plans and specifications were prepared by a licensed plumber. Only the plumber who has prepazed the <br /> pians may use the plans for construction. If another plumber is contracted to install the plumbing, they must <br /> submit their own plans and specifications for the project. <br /> Authoriza.tion for construction in accordance with the approved plans may be withdra.wn if construction is not <br /> undertalcen within a period of two years. The fact that the plans have been approved.does not necessarily mean that <br /> recommendations or requirements for change will not be made at some later time when changed conditions, <br /> additional information, or advanced knowledge make impro�ements necessary. <br /> Approved: <br /> � r._. <br /> Scott Sawyer,P.E. <br /> Public Health Engineer • <br /> Plumbing Plan Review and Inspections Unit <br /> 651/284-5803 <br /> cc: Nathan T Duda <br /> Nate Berg <br /> City of Orono Building Official <br /> File <br />