My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arch/structural specs for addition
Orono
>
Property Files
>
Street Address
>
A
>
Abingdon Way
>
2180 Abingdon Way - 03-117-23-24-0012
>
Misc
>
Arch/structural specs for addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:36:04 PM
Creation date
7/26/2018 3:33:21 PM
Metadata
Fields
Template:
x Address Old
House Number
2180
Street Name
Abingdon
Street Type
Way
Address
2180 Abingdon Way
Document Type
Misc
PIN
0311723240012
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
01600 MATERtAL AND EQUIPMENT <br /> General: <br /> Substitutions: Contract is based on the standards of quality established in the Coniract Documents. <br /> Substitutions will be consid�ed only when listed at the rime of bidding. <br /> Do not substitute materials,equipment,or methods unless such substitution has been approved <br /> specifically in writing by the Architect for this Work <br /> Where the phrase"or equal"occurs in the Contract Document�,do not assume that the materials, <br /> equipment,or other methods will be appnoved as equal unless the item has been specifically so approved <br /> for this Work by the Architect <br /> Product Handling:Comply with the manufacturer's recommendation on product handling,storage and <br /> protection.Deliver products to the job site in their original containers,with labels intact anci le�ible. All <br /> material shall be stored offthe sround„und�er waterproof en-closures.and awav from wet or dac�p <br /> surfaces. Maintain all finished surfaces clean and unmarred,and suitably protected until accepted by <br /> Owner. <br /> 0170(1 PROdECT CLOSEOUT <br /> General: <br /> When the various construction Work is within fifteen(15)days of completion,the various Contractors <br /> shall give written notice to the Architect of date of substantial compl�tion and ready for pre-final <br /> inspection. <br /> All$ubcontractors shall take action required to correct a�l deficiencies listed and when tbey have been <br /> completed,a final inspection will be made. <br /> Upon completion of final inspection the Architect can state that the project is complete,or if work <br /> remains that a sum,satisfactory to insure t�e performance of the work,be retained until completion. <br /> When project is approaching completion and final payment,a11 Sub-Contractors shall secure lien wavers <br /> in full for labor and material furnished from all suppliers. Inadequate,incomplete,or insufl3cient wavers <br /> shall constihrte cause for non-approval of final application for payments. <br /> Project record docnments: <br /> Throughout progress of the Work,each Contractor will maintain an accurate cecord of changes in the <br /> Contract Documents. Maintain one complete set of the Contract Documents on the Site,to be used only <br /> as the"Job Record Set". <br /> Do not use th�Job Record Set for any purpose other than to record changes occurring in the Contract <br /> Documents during th�progress of the Work. Make entries within 24 hours after receipt of information <br /> that the change has occurred. Upon completion of the Work,and as a condition of its acceptance,deliver <br /> the properly annotated Job Record Set to the Architect. <br /> 010740 WA►�tRANTIES <br /> Each Contractor shall be responsible for its own work and shall repair or replace(at its own e�ense)any <br /> defective work or material which may show itself within one year after issuance of Certificate of Final <br /> Completiun by the Owner. <br /> END OF DIVISION 1 . <br /> GENERAL REQUIREMENTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.