Laserfiche WebLink
B. Notification: Immediately following th�award of the Contract,notify each party involved,in <br /> writing,of the status of each altemate. Indicate whether alternates have been acce�ted,r8jected,or <br /> deferred for later consideration. Include a complete description of negotiated modifications to <br /> alternates. <br /> C. Execute accepted alternates under the same conditions as other Work of this Contcact. <br /> D. Schedule: A"Schedule of Altemates"may be included at the end of this Section. Specification <br /> Sections referenced in the Schedule contain requirements for materials necessary to achieve the <br /> Work described under each altemate. <br /> Products(Not Applicable) <br /> Ezecation <br /> Schedule of$ltemates <br /> 01050 FIELD 1NSTALLATION <br /> Laying and Staking Ont: <br /> A Surveyor hired by th Owner shall meet with the Architect to determine exact location,accurately lay <br /> but the work and provide necessary instruments,etc.,according to the drawings furnished.However each <br /> Con r will be held resnonsible for verifvin�the correct location of ti�eir work on the premises. <br /> 01300 SUBMITTALS <br /> Sequence of Work/Security: <br /> The Contractor shall be responsible for setting a sch�dule and will be responsible for coordinating <br /> � security with the Owner. <br /> 01340 SHOP DRAWINGS <br /> Make all Shop Dravvings accurately to scale and suf�iciently large to show all pertinent fea.tures of the <br /> item and its method of connection to the Work. <br /> Submit 3 copies of Shop Drawin�which are�lear and legible in blue or black line on white background. <br /> 01410 TESTING LAB+ORATORY SERVICES <br /> G�neral: <br /> The Owner will select an independent testing laboratory,if reqaired. <br /> When initial tests indicate non�;ompliance with the Contract Documents,subsequent retesting <br /> occasioned by ti�e same testing agency,and costs thereof will be charged to the responsible Sub- <br /> Contractor. <br /> 01500 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS <br /> General: <br /> Owner shall pay for all water,electricity,gas,temporary l�eat and other utilities needed during progress <br /> of construction. <br /> Products: <br /> The various contractars retained by the Owner shall provide such temporary facilities,and utilities as are <br /> required for the safe and proper completion of the Worlc. <br /> Eaecallon: <br /> The various contractors shall maintain temporary facilities and controls as long as needed for safe and <br /> proper completion of the Work. Remove such te,mporary facilities and controls as rapidly as progress of <br />