My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arch/structural specs for addition
Orono
>
Property Files
>
Street Address
>
A
>
Abingdon Way
>
2180 Abingdon Way - 03-117-23-24-0012
>
Misc
>
Arch/structural specs for addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:36:04 PM
Creation date
7/26/2018 3:33:21 PM
Metadata
Fields
Template:
x Address Old
House Number
2180
Street Name
Abingdon
Street Type
Way
Address
2180 Abingdon Way
Document Type
Misc
PIN
0311723240012
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Notification: Immediately following th�award of the Contract,notify each party involved,in <br /> writing,of the status of each altemate. Indicate whether alternates have been acce�ted,r8jected,or <br /> deferred for later consideration. Include a complete description of negotiated modifications to <br /> alternates. <br /> C. Execute accepted alternates under the same conditions as other Work of this Contcact. <br /> D. Schedule: A"Schedule of Altemates"may be included at the end of this Section. Specification <br /> Sections referenced in the Schedule contain requirements for materials necessary to achieve the <br /> Work described under each altemate. <br /> Products(Not Applicable) <br /> Ezecation <br /> Schedule of$ltemates <br /> 01050 FIELD 1NSTALLATION <br /> Laying and Staking Ont: <br /> A Surveyor hired by th Owner shall meet with the Architect to determine exact location,accurately lay <br /> but the work and provide necessary instruments,etc.,according to the drawings furnished.However each <br /> Con r will be held resnonsible for verifvin�the correct location of ti�eir work on the premises. <br /> 01300 SUBMITTALS <br /> Sequence of Work/Security: <br /> The Contractor shall be responsible for setting a sch�dule and will be responsible for coordinating <br /> � security with the Owner. <br /> 01340 SHOP DRAWINGS <br /> Make all Shop Dravvings accurately to scale and suf�iciently large to show all pertinent fea.tures of the <br /> item and its method of connection to the Work. <br /> Submit 3 copies of Shop Drawin�which are�lear and legible in blue or black line on white background. <br /> 01410 TESTING LAB+ORATORY SERVICES <br /> G�neral: <br /> The Owner will select an independent testing laboratory,if reqaired. <br /> When initial tests indicate non�;ompliance with the Contract Documents,subsequent retesting <br /> occasioned by ti�e same testing agency,and costs thereof will be charged to the responsible Sub- <br /> Contractor. <br /> 01500 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS <br /> General: <br /> Owner shall pay for all water,electricity,gas,temporary l�eat and other utilities needed during progress <br /> of construction. <br /> Products: <br /> The various contractars retained by the Owner shall provide such temporary facilities,and utilities as are <br /> required for the safe and proper completion of the Worlc. <br /> Eaecallon: <br /> The various contractors shall maintain temporary facilities and controls as long as needed for safe and <br /> proper completion of the Work. Remove such te,mporary facilities and controls as rapidly as progress of <br />
The URL can be used to link to this page
Your browser does not support the video tag.