Laserfiche WebLink
SITE WORK <br /> SECTION 02070 <br /> SELECTIVE DEMOLITION <br /> Generai: <br /> Demolition: Provide all materials and labor to accomplish demolition as may be reasonably required to carry <br /> out the Work set forth in the Contract Documents such as walls,roof areas,floors,fmishes,lighting fixtures, <br /> doors,windows etc. This Contractor shall salvage all items that are in good condition and can be reused, <br /> such as Overhead doors,Door assemblies,Windows,Light fixtures,Wood Shakes Etc. With respect to all <br /> intemal partitions and fmishes,all demolition indicated or required and not otherwise assigned,is included <br /> under the responsibility of the Demolition Contractor. This includes certain areas of the existing residence <br /> and garage. If this Contractor has any questions conceming wether an item is salvageable or not,he must <br /> contact Architect. <br /> This Contractor shall protect all trees marked with a red ribbon. He shall also protect all existing exterior <br /> construction such as existing Roofs,Tennis Court, Pool,Cabana,Exterior Lighting,Stairs,Walls,Patios, <br /> Piers, Gates, Fences both permanent and temporary, Walks and the Main House. It is this contractors <br /> responsibility to protect all utility boxes of all types both inside and outside the building parts to be <br /> demolished. <br /> The Demolition Contractor,at their own expense,shall make good to the General Contractor or any person <br /> whose property is damaged or destroyed as a result of demolition operations. He is not responsible for <br /> damage caused by others. He is to inspect the job before he begins his work and report damage to any items <br /> to be saved. <br /> Termination of Services: Each Trade shall terminate its own services to existing construction which are to <br /> be permanently disconnected. They shall further make all temporary service terminations indicated or <br /> replaced services required as a part of work under all Contracts. <br /> Disposal: The Demolition Contractor is responsible for removal,hauling,and disposing of all debris on a <br /> weekly basis. If his debris is not removed on a weekly basis, the Owner shall have it removed and the <br /> Demolition Contracior shall be charged for this removal. <br /> END OF SECTION 02070 <br /> SITE WORK ' <br /> Page 1 of 1 <br />