My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arch/structural specs for addition
Orono
>
Property Files
>
Street Address
>
A
>
Abingdon Way
>
2180 Abingdon Way - 03-117-23-24-0012
>
Misc
>
Arch/structural specs for addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:36:04 PM
Creation date
7/26/2018 3:33:21 PM
Metadata
Fields
Template:
x Address Old
House Number
2180
Street Name
Abingdon
Street Type
Way
Address
2180 Abingdon Way
Document Type
Misc
PIN
0311723240012
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SITE WORK <br /> SECTION 02070 <br /> SELECTIVE DEMOLITION <br /> Generai: <br /> Demolition: Provide all materials and labor to accomplish demolition as may be reasonably required to carry <br /> out the Work set forth in the Contract Documents such as walls,roof areas,floors,fmishes,lighting fixtures, <br /> doors,windows etc. This Contractor shall salvage all items that are in good condition and can be reused, <br /> such as Overhead doors,Door assemblies,Windows,Light fixtures,Wood Shakes Etc. With respect to all <br /> intemal partitions and fmishes,all demolition indicated or required and not otherwise assigned,is included <br /> under the responsibility of the Demolition Contractor. This includes certain areas of the existing residence <br /> and garage. If this Contractor has any questions conceming wether an item is salvageable or not,he must <br /> contact Architect. <br /> This Contractor shall protect all trees marked with a red ribbon. He shall also protect all existing exterior <br /> construction such as existing Roofs,Tennis Court, Pool,Cabana,Exterior Lighting,Stairs,Walls,Patios, <br /> Piers, Gates, Fences both permanent and temporary, Walks and the Main House. It is this contractors <br /> responsibility to protect all utility boxes of all types both inside and outside the building parts to be <br /> demolished. <br /> The Demolition Contractor,at their own expense,shall make good to the General Contractor or any person <br /> whose property is damaged or destroyed as a result of demolition operations. He is not responsible for <br /> damage caused by others. He is to inspect the job before he begins his work and report damage to any items <br /> to be saved. <br /> Termination of Services: Each Trade shall terminate its own services to existing construction which are to <br /> be permanently disconnected. They shall further make all temporary service terminations indicated or <br /> replaced services required as a part of work under all Contracts. <br /> Disposal: The Demolition Contractor is responsible for removal,hauling,and disposing of all debris on a <br /> weekly basis. If his debris is not removed on a weekly basis, the Owner shall have it removed and the <br /> Demolition Contracior shall be charged for this removal. <br /> END OF SECTION 02070 <br /> SITE WORK ' <br /> Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.