My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arch/Structural specs for cabana,pool,hot tub areas
Orono
>
Property Files
>
Street Address
>
A
>
Abingdon Way
>
2180 Abingdon Way - 03-117-23-24-0012
>
Misc
>
Arch/Structural specs for cabana,pool,hot tub areas
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:36:04 PM
Creation date
7/26/2018 3:15:05 PM
Metadata
Fields
Template:
x Address Old
House Number
2180
Street Name
Abingdon
Street Type
Way
Address
2180 Abingdon Way
Document Type
Misc
PIN
0311723240012
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> Where the phrase"or equal"occurs in the Contract Documents,do not assume that the materials, <br /> � equipment,or other methods will be approved as equal unless the item has been specifically so approved <br /> for this Work by the Architect <br /> ' Product Handling:Comply with the manufacturer's recommendation on product handling,storage and <br /> prote�tion.Deliver products to the job site in thezr original containers,with labels intact and legible. All <br /> material shall be stored off the�rottnd,under waterproof en-closnres, and away&om wet or damp <br /> � surfaces. Maintain all finished surfaces clean and unmarred,and suitably protected untii accepted by <br /> Owner. <br /> � 01700 PROJECT CLOSEUUT <br /> Generat: <br /> ' When the various cor►struction Work is within fifteen(1 S)days of completion,the various Contractors <br /> shall give wiitten notice to the Archi#ect of date of substant�al completion and ready for pre-fin�al <br /> � inspection. <br /> Ali Subcontractors shall take action required to correct all deficiencies listed and when they have been <br /> completed,a final inspection will be made. <br /> ' U on com letion of final ins ection the Architeet eatt state that tbe ro'ect is com lete,or if work <br /> p P P P J P <br /> remains that a sutm,satisfactory to inseu'e the performance of the work, be retained until completion. <br /> ' When project is approaching completion and final payment,all Sub-Contractors shali secure lien wavers <br /> in full for labor and materiai furnislted itom a31 suppliers. Inadequa.te,in.complete,or insufficient wavers <br /> � shall constitute cause for non-approval ef fmal application for payments. <br /> Project record documents: <br /> � Throughout progress of the Work,each Contractor will maintain an accurate record of changes in the <br /> Conh�act Documents. Mgintain one complete set of the Contract Documents on the Site,to i�e used only <br /> � as the"Job Record Set". <br /> Do not use tlne 7ob Record Set for any purpase other than to record changes occurring in the Contract <br /> � Documents during the progress of the Work. Make entries within 24 hours after receipt of information <br /> that the change has occurned. Upon completion of the Work,and as a condition of its acceptance,deliver <br /> the properly annotated 7ob Record Set to the Architec� <br /> � 010740 WA�RRANTIES <br /> � Each Contractor shall be responsible for its own work and shall repair or replace(a#its own expenss)any <br /> defective work or material which may show itself within one year after issuance of Certif cate of Final <br /> Completion by the Owner. <br /> , END OF <br /> DMSION 1 -GENERAL REQUIREMENTS <br /> � <br /> � <br /> � SUMMARY OF WORK Page 5 of 5 <br /> GENERAL REQUIREMENTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.