Laserfiche WebLink
� <br /> 013{IO SUBNIITTALS <br /> Seqaence of Wark/Secacity: ' <br /> The Cabana Contractor shaI!be responsible for setting a schedule and will be responsible for coordinating � <br /> security with the Owner. <br /> 01340 SHOP DRAWINGS � <br /> Make all Shop Drawings accurately to scale and sufficiendy large to show alI pertinent features of the <br /> item and its method of connection to the Work. , <br /> Submit 3 capies of Shop Drawings which are clear and legible in blue or black line on white backgcound. <br /> 01410 TESTIl�IG LASORATORY SER'V�CES r <br /> General: <br /> The Owner will select an inde ndent testin laborato if r uired. � <br /> Pe 8 rY� e9 <br /> When initial tests indicate non-compliance with t�e Contract Documents,subsequent retesting , <br /> occasioned by the same testing agency,and costs thereof will be chazged to the responsible Sub- <br /> Contractor. <br /> 0154(1 CONSTRUCTION FACYLITIES AND TEMPORARY CONTROLS � <br /> General: � <br /> Owner shall pay for ail water,electricity,gas,temporary heat and other utilities needed during progress <br /> of construction. � <br /> Products: <br /> The various contractors retained by the Owner shail provide such temporary facilities,and utiiities as are � <br /> required for the safe and proper completion of the Woric. <br /> Eaecution: r <br /> The various contractors shall maintain temporary facilities and controls as long as needed for safe and � <br /> proper completion of the Work. Remove such temporary facitities and controIs as rapidly as progress of <br /> the Work will Permit <br /> Coordinate location of temporary faciIities so as not to disrupt the neighbors. � <br /> 01500 MATERIAL AND EQUIPMENT <br /> General: � <br /> Substitutions:Coatract is based on the stsndards of qeiality established in the Contract Documents. ' <br /> Substitu#ions will be considered oniy when listed at the time of bidding. <br /> Do not substitute materials,equipment,or mefihods unless suc�substitutivn has been approved � <br /> specifieally in writing by the Architect for this Work <br /> SUMMARY OF WORK Page 4 of 5 � <br /> GENERAL REQUIREMENTS <br />