My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arch/Structural specs for cabana,pool,hot tub areas
Orono
>
Property Files
>
Street Address
>
A
>
Abingdon Way
>
2180 Abingdon Way - 03-117-23-24-0012
>
Misc
>
Arch/Structural specs for cabana,pool,hot tub areas
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:36:04 PM
Creation date
7/26/2018 3:15:05 PM
Metadata
Fields
Template:
x Address Old
House Number
2180
Street Name
Abingdon
Street Type
Way
Address
2180 Abingdon Way
Document Type
Misc
PIN
0311723240012
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> 013{IO SUBNIITTALS <br /> Seqaence of Wark/Secacity: ' <br /> The Cabana Contractor shaI!be responsible for setting a schedule and will be responsible for coordinating � <br /> security with the Owner. <br /> 01340 SHOP DRAWINGS � <br /> Make all Shop Drawings accurately to scale and sufficiendy large to show alI pertinent features of the <br /> item and its method of connection to the Work. , <br /> Submit 3 capies of Shop Drawings which are clear and legible in blue or black line on white backgcound. <br /> 01410 TESTIl�IG LASORATORY SER'V�CES r <br /> General: <br /> The Owner will select an inde ndent testin laborato if r uired. � <br /> Pe 8 rY� e9 <br /> When initial tests indicate non-compliance with t�e Contract Documents,subsequent retesting , <br /> occasioned by the same testing agency,and costs thereof will be chazged to the responsible Sub- <br /> Contractor. <br /> 0154(1 CONSTRUCTION FACYLITIES AND TEMPORARY CONTROLS � <br /> General: � <br /> Owner shall pay for ail water,electricity,gas,temporary heat and other utilities needed during progress <br /> of construction. � <br /> Products: <br /> The various contractors retained by the Owner shail provide such temporary facilities,and utiiities as are � <br /> required for the safe and proper completion of the Woric. <br /> Eaecution: r <br /> The various contractors shall maintain temporary facilities and controls as long as needed for safe and � <br /> proper completion of the Work. Remove such temporary facitities and controIs as rapidly as progress of <br /> the Work will Permit <br /> Coordinate location of temporary faciIities so as not to disrupt the neighbors. � <br /> 01500 MATERIAL AND EQUIPMENT <br /> General: � <br /> Substitutions:Coatract is based on the stsndards of qeiality established in the Contract Documents. ' <br /> Substitu#ions will be considered oniy when listed at the time of bidding. <br /> Do not substitute materials,equipment,or mefihods unless suc�substitutivn has been approved � <br /> specifieally in writing by the Architect for this Work <br /> SUMMARY OF WORK Page 4 of 5 � <br /> GENERAL REQUIREMENTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.