My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arch/Structural specs for cabana,pool,hot tub areas
Orono
>
Property Files
>
Street Address
>
A
>
Abingdon Way
>
2180 Abingdon Way - 03-117-23-24-0012
>
Misc
>
Arch/Structural specs for cabana,pool,hot tub areas
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:36:04 PM
Creation date
7/26/2018 3:15:05 PM
Metadata
Fields
Template:
x Address Old
House Number
2180
Street Name
Abingdon
Street Type
Way
Address
2180 Abingdon Way
Document Type
Misc
PIN
0311723240012
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> � SITE WORK <br /> � 02070 SELECTIVE DEMOLITiON <br /> General: <br /> iDemolition: Provide aU materials and labor to accomplish demolition as may be reasonably required ta carry <br /> out#he Work set forth in the Contract Docusnents. The Demolition Contractor(This Cotttra.ctor} shall <br /> � salvage any items that are in good condition and can be reused. All demolition exterior waIls, stairs etc. <br /> indicated or required and not ottierwise assigned, is included under the responsibility of this Contractor. <br /> This Contractor shall protect all trees marked with a red ribi�on. He shall also proteot all feuces, both <br /> ' tennporary and permanen#, the iree shack and the main house. This Contractor shail contact atl �tility <br /> companies for the location flf atl utility lines in the construction area before beginning the work as it shall <br /> be his responsibility to proteet all ubility lines and utility boxes af all types,both on or in the ground <br /> � This Contractor shall operate within the construction limit boundary lines shawn on the architect's site <br /> drawing. <br /> � Repairs: This Contractor,at their own expense,shall make good to the General Contractor or any person <br /> whose property is damaged or destroyed as a result of demolition operations. He is not responsible for <br /> damage caused by others,however he must inspect the property to be demolished and regort any damage of <br /> � items to be sa.ved before he begins his work. <br /> Termination of Services: Each Trade shall terminate its own services to existing construction which are to <br /> be permanently disconnected. They shall further make all temporary service terminations indicated or <br /> � replaced services required as a part of work under all Contracts. <br /> Disposal: This Contractor is responsible for removal,hauling,and disposing af all debris resulting from his <br /> � operation every two days. <br /> Salvaged items shall be Ieft on the site at a spot chosen by the Construction Manager. <br /> � END OF SECTION 02070 <br /> � <br /> � <br /> � <br /> � <br /> r <br /> ' SELECTNE DEMULITI4N Page i of 1 <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.