My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arch/Structural specs for cabana,pool,hot tub areas
Orono
>
Property Files
>
Street Address
>
A
>
Abingdon Way
>
2180 Abingdon Way - 03-117-23-24-0012
>
Misc
>
Arch/Structural specs for cabana,pool,hot tub areas
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:36:04 PM
Creation date
7/26/2018 3:15:05 PM
Metadata
Fields
Template:
x Address Old
House Number
2180
Street Name
Abingdon
Street Type
Way
Address
2180 Abingdon Way
Document Type
Misc
PIN
0311723240012
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> Where the phrase "or equai"occurs in the Contract Documents,do nat assume that the materials, <br /> ' equipment,or other methods will be approved as equal�nless the item has been specifica.ily so approved <br /> for this Work by the Architect. <br /> ' Product Handling: Comply with the manufacturer's recommendation on product handling,storage and <br /> protection.Deliver products to the job site in their original containers,with labels intact and legible. All <br /> material shall be stored off the�round.under waterproof en-closures, and away from wet or dam� <br /> ' swrfaces. Maintain all finished s�ufaces clean and unmarred,and suitably protected until accepted by <br /> Owner. <br /> ' 01700 PROJECT CLUSEOUT <br /> General: <br /> ' When the various construction Work is within fifteen(15)days of completion,the various Contractors <br /> shall give written notice to the Archi#ect of da.te of substantial completion artd ready for pre-fuxal <br /> inspection. <br /> ' All Snbcontractors shall take action r uired to correct all defi ' <br /> eq c�encies listed and when tt�ey have been <br /> completsd,a finaI inspection wiU be made. <br /> ' Upon completion af fmal ins�ction the Architect can state that the ro'ect is com lete or if work <br /> P J P � <br /> remains that a surn,satisfactory to insure the performance of the work,be retained until completion. <br /> , When project is approaching completion and final payment,a!1 Syb-Contractors shall secure lien wavers <br /> in full for labor and material fiunished from all suppliers. Inadequate,incomplete,or insufficient wavers <br /> ' shall constitute cause for non-approval of fmal application for payments. <br /> Project record documents: <br /> , Throughout progress of the Work,each Contractor will maintain an accurate record of changes in the <br /> Contract Documents. Maintain one camplete set of the CQntract Documents on the Site,to be used only <br /> ' as the"Job Record Set". <br /> Do not use the Jab Record Se#for any purpase other than to record ohaBges occurcing in the Contract <br /> ' Documents during the progress of the Work. Make entries within 24 hours after receipt nf information <br /> that the change has occutred. Upon completion of the Work,and as a condition of its acceptance,deliver <br /> the properly annotated Job Record Set to the Archite��. <br /> , O1U740 WA�RRANTIES <br /> , Each Contractor s1�at1 be responsible for its own work and shall repair or replace(at its own expense)ariy <br /> defective work or material which may show itself within one year after issuance of Certif cate of Final <br /> Completion by the Owner. <br /> , END OF <br /> DIVISION 1 -GENERAL REQUIREMENTS <br /> ' <br /> ' <br /> ' SUlVIl1�ARY�F WORK Page 5 of 5 <br /> GENERAL REQUIREMENTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.