My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arch/Structural specs for cabana,pool,hot tub areas
Orono
>
Property Files
>
Street Address
>
A
>
Abingdon Way
>
2180 Abingdon Way - 03-117-23-24-0012
>
Misc
>
Arch/Structural specs for cabana,pool,hot tub areas
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:36:04 PM
Creation date
7/26/2018 3:15:05 PM
Metadata
Fields
Template:
x Address Old
House Number
2180
Street Name
Abingdon
Street Type
Way
Address
2180 Abingdon Way
Document Type
Misc
PIN
0311723240012
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' <br /> 01300 SUBNIITTAI.S <br /> Seqae�ce of WorWSecarity: , <br /> The Cabana Contractor shal!be respansible for setting a schedule and will be responsibie for coordinating ' <br /> security with the Owner. <br /> 01340 SHOP DI2AWlNGS � <br /> Make all Shop Drawings accurately to scale and sufficiently large to show all pertinent features of the <br /> item and its method of connection to the Work, ' <br /> Submit 3 copies of Shop Drawings which are clear and legible in blue or black line on white background. <br /> 01410 TESTING LABORATORY SERVICES ' <br /> General: , <br /> The Owner will select an independent testing iaboratory,if reqnired. <br /> When initial tests indicate non-compliance wit�t the Contract Documents,subsequent retesting ' <br /> occasioned by the same testing agency,and costs thereof will be charged to the responsible Sub- <br /> Contractor. <br /> 01500 CONSTRUCTION FACILiT1ES AND TEMPORARY CONTROLS ' <br /> Genecal: , <br /> Owner shall pay for all water,electricity,gas,temporary heat and other utilities needed during progress <br /> of construction. ' <br /> Products: <br /> The vacious contractors retained by the Owner shall provide such temporary facilities,and utiiities as are ' <br /> required for the safe and proper completion of the Work. <br /> Eae�ution: , <br /> The various cantractors shall maintain temporary facilities and controls as long as needed for safe and , <br /> proper completion of the Work. Remove such temparary facilities and controls as rapidly as progress of <br /> the Work will Permit. <br /> Coordinate iocation of temporary facilities so as not to disYupt the neighbors. � <br /> 01600 MA.TERIAL AND EQUII'MENT ' <br /> Geaeral: <br /> Substitutions:Contract is based on the standards of quality established in the Contract Docurnents. � <br /> Substit►rtions will be considered oniy when listed at the time of bidding. <br /> Do not substitute materials,equipment,or methods unless such substitution has been approved , <br /> specifically in writing by the Architect for this Work <br /> SUMMARY OF WORK Page 4 of 5 , <br /> GENERAL REQUIREMENTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.