My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arch/Structural specs for cabana,pool,hot tub areas
Orono
>
Property Files
>
Street Address
>
A
>
Abingdon Way
>
2180 Abingdon Way - 03-117-23-24-0012
>
Misc
>
Arch/Structural specs for cabana,pool,hot tub areas
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:36:04 PM
Creation date
7/26/2018 3:15:05 PM
Metadata
Fields
Template:
x Address Old
House Number
2180
Street Name
Abingdon
Street Type
Way
Address
2180 Abingdon Way
Document Type
Misc
PIN
0311723240012
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' <br /> ' SITE WORK <br /> ' 020'IU SEI.ECTIVE DEMOLTTION <br /> General: <br /> ' Demolition: Provide all materials and Iabor to accomplish demolition as may be reasonably required to carry <br /> out the Work set forth in the Contract Documents. The Demolition Contractor(This Contractor) shali <br /> ' salvage any items that are in good condihon and can be reused. All demolition exterior waIls, stairs etc. <br /> indicated or required and not otherwise assigned,is included under the responsibility of this Contractor. <br /> This Contractor shall protect all trees marked with a x�i ribbon. He shali also protect all fances, both <br /> ' temporary and permanent, the tree shack and the main house. This Contractor shall contact a11 utility <br /> cornpanies for the location of atl utility lines in the construction area before beginning the work as it shail <br /> be his responsibility#o proteet all utility lines and utility boxes of all types,bath on or in the ground <br /> ' This Contractor shall operate within the construction litnit baurtdary lines shown on#he architect's site <br /> drawing. <br /> ' Repairs: This Contractor,at their own expense,shall matce good to the General Contractor or any�rson <br /> whose property is damaged or destroyed as a result of demolition operations. He is not responsible far <br /> damage caused by others,however he must inspect the pmperty to be demolished and report any damage of <br /> ' items to be sa.ved before he begins luis work. <br /> Termination of Services: Ea.ch Trade shall terminate its own services to existing construction which are to <br /> be permanently disconnected. They shall further make ail temporary service terminations indicated or <br /> ' replaced services required as a part of work under all Contracts. <br /> Disposal: This Contractor is responsible for ramoval,hauling,and disposing of all debris resulting frorn his <br /> ' operation every two days. <br /> Salvaged items shall be Ieft on the site at a spot chosen by the Construction Manager. <br /> IEND OF SECTION 02070 <br /> , <br /> ' <br /> , <br /> , <br /> ' <br /> ' SELECTIVE DEMQLITION Page 1 of 1 <br /> ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.