My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arch/Structural specs for cabana,pool,hot tub areas
Orono
>
Property Files
>
Street Address
>
A
>
Abingdon Way
>
2180 Abingdon Way - 03-117-23-24-0012
>
Misc
>
Arch/Structural specs for cabana,pool,hot tub areas
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:36:04 PM
Creation date
7/26/2018 3:15:05 PM
Metadata
Fields
Template:
x Address Old
House Number
2180
Street Name
Abingdon
Street Type
Way
Address
2180 Abingdon Way
Document Type
Misc
PIN
0311723240012
Supplemental fields
ProcessedPID
Updated
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' <br /> I7efmitions: <br /> ' THE DEFINITION BEI,OW AMPLIFIES THE DEFIlVITTON IN AIA DOCUMENT A701, <br /> "INSTRUCTIONS TO BIDDERS."IT ASSUMES THE NORMAL BIDDING SITUATION WTTH <br /> ' CONTRACTORS STATING ALTERNATE AMOUNTS REQUESTED�N THE BID FORM. IT <br /> ALSO A5SUMES THAT THE OWNER WILL DECIDE TO ACCEPT OR REJECT ALTERNATES <br /> BEFORE SIGNRJG THE AGREEMENT. IT ALSO ASSUMES THAT THE BIDDII�iG <br /> � DOCUMENTS STIl'ULATE TERMS UNDER WHiCH THE OWNER WILL ACCEPT OR REJECT <br /> THE ALTERNATES. <br /> Alternates: � <br /> , A. Defmition: Aa altemate is an amount proposed by bidders and sta.ted on the Bid Form for certain <br /> work defined in the Bidding Requirem$nts that may be added to or deductcd from the Bsse Bid <br /> ' amount if the Owner decides to accept a corresponding change in either the amount of construction <br /> to be completed,or in the products,materiaIs,equipment,systems,or installation methods <br /> described in the Contract Uocuments. <br /> ' 1. The cost or credit for each aItemate is the net addition to or deduction from the <br /> Cvntract Sum to incoxporate the Alternate into the Work No ather adjustrnents are <br /> , made to the Contract Sum. <br /> Procedures: <br /> ' A. Coordination: Modify or adjust affected adjacent Work as necessary to completely and fully <br /> integrate�at Work into the Project. <br /> 1. Include as part of each alternate,miscellaneous devices,accessory objects,and similaz <br /> ' items incidental to or required for a complete installation whether or not mentioned as part of <br /> the Altemate. <br /> , B. Notification: Immediately following the award of the Contract,notify each party involved, in <br /> writing,of the status of each altemate. Tndicate whether alternates have been accepted,rejected,or <br /> deferred for later consideration. Inctude a complete description of negotiated modif'ications to <br /> ' alternates. <br /> C. Execute accepted aiternates under the same conditions as other Work of this Contract. <br /> ' D. Scheclule: A"Schedule of Alternates"may be included at the end of this Secdon. Specification <br /> Sections referenced in the Schedule contain requirements for materials necessary to achieve the <br /> ' WorlE described under each alternate. � <br /> Prodacts(Not Applicable) <br /> � Execution <br /> Schedule of aiternates <br /> ' Q1050 FIELD INSTALLATION <br /> � I,$ying�nd Staldng Uut: <br /> A Surveyor hired by th Ownsr shall meet with the 4wner or their Architect to detern2ine exact location, <br /> accurately lay out the work and provide necessary instrume�ts,etc.,accordigg to the drawings furnished. <br /> ' However each Contractor wIll be held responsible for verifying the conect location of their work on the <br /> premises. <br /> ' SUMMARY OF WORK Page 3 0#5 <br /> GENERAL REQUIItEMENTS <br />
The URL can be used to link to this page
Your browser does not support the video tag.