Laserfiche WebLink
Installer Summary <br /> 2250 gallon Septic tank(minimum) Tank options: none <br /> �u�e wrger tanK w�cn muiL�pte compi�anres <br /> 1300 gallon Dose tank iminimum) at 25.49 gpi <br /> 38 GPM @ 19 ft. of head, Pump required <br /> 7.8 inch swing on Demand float which transtates to roughly 4.9 inches of ftoat tether length <br /> if time dosing is required --> 5.3 minutes ON time& �hours OFF time <br /> 20 inches from bottom of tank to"pump ON"float, or 12 inches to"timer ON"float <br /> 23 inches from bottom of tank to"Hi Level Alarm"or 33 inches to"Hi levet atarm"if time dosed <br /> 73 ft. of 2.0 inch supply line with end feed manifold connection <br /> (Tip: "top feed"manifold to control drainback) <br /> 14 inch, or 1.2 ft. Sand Lift Mound <br /> 10.0 ft. wide by 31.3 ft. long Rock bed <br /> 3 lateraLs 2.00 inch diameter 24.3 ft. long 3.0 ft. laterat spacing <br /> 7/32 inch perfs 3.0 ft. perforation spacing <br /> No Effluent filter&alarm <br /> 3 clean out 8 valve box assembltes <br /> 20.0 ft.Tatal sand ABSORPTION width (minimumy <br /> 0.0 ft. upslope and sideslope (sand beyond rockbed, minimum) <br /> 10.0 ft. Oownslope �san�beyonq rockDeC. minimum� <br /> Specific slope ratios give BERM widths {topsoil beyond rockbedj of: <br /> 4:i upslope ratio 11 ft, upslope berm <br /> 3:1 sideslope 12 ft. si+deslope berms <br /> 4:1 downstope 12 ft. downslope berm <br /> 4" inspection pipe <br /> 18" co�er on top <br /> U slo e berrn �� Downslo berm 12 <br /> 12" cover on sides <br /> '� ��� (6'baur�►cnP&6°topso� <br /> 1.2 � ^ , ��'�.. <br /> ;�(;s�t: �-,1�3 i�fr -�"�-.. <br /> ._ _�_ �- - �.'8 " -- - _- - _ '`-... <br /> - • • • .. . .= Absor tian lM1�idth 20.0 ~--._ _ -_ �-- -._ ..__._ ——�_. <br /> Note: <br /> For 0 to 19b slopes� .4bsar,vticn Width is measured from Che Bedequally in both directions. <br /> For s[opes >1i�, Absarption H�Yd�h is measured downhitl fram the upslope ed�e of the Beu! <br /> Rock Bed: 11.0 yd3 or"1.4� 15 ton 6 inches under pipe <br /> Mound Sand: 73 yd3 or*1.4= 102 ton cakulation based on 3:1/4:1 slope from top of rockbe� <br /> Loamy Cap: 34 Yd3 or'1.M 4g ton 6"deep <br /> Topsoit: 41 yd3 or"1.4- 57 ton 6"deep <br />